KitLog pro

Powered By Kitlog Pro v2.0

Aviation Partners, LLC Project
' style=
Date:  1-31-2011
Number of Hours:  7.00
Manual Reference:  None
Brief Description:  Installed Matco Parking Brake

Fabricated a bracket using the un-used fuel pump bracket that came with the kit. Removed the support bracket on the firewall for the line terminations and replaced with the Matco PV-2 parking brake valve. Fabricated an arm to attach the parking brake cable.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.