KitLog pro

Powered By Kitlog Pro v2.0

Aviation Partners, LLC Project
' style=
Date:  1-24-2011
Number of Hours:  18.00
Manual Reference:  Section 37 Fuel
Brief Description:  Fabricated Lines and Installed Fuel System

We completed the installation of the fuel system, section 37 in its entirety. The selector handle will be re-installed after the console is installed. Insulation was installed under the lines in both the tunnel and on the floor under the front bulkead. Insulation was also installed under the front floors. Both the left and right front floors have also been closed, thus completing section 29-20.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.