KitLog pro

Powered By Kitlog Pro v2.0

Aviation Partners, LLC Project
' style=
Date:  1-6-2011
Number of Hours:  6.00
Manual Reference:  None
Brief Description:  Ran additional conduit through baggage floor

I fabricated two additional support brackets for the rear bulkhead 1006A, to support the conduit exit point, and ran the conduit directly forward through the 1005A bulkhead. I drilled a .630 hole in both sides under and used a snap bushing to terminate the conduit at that bulkhead. Two Adell clamps were used to suppor the conduit under the baggage compartment and under the rear seats. The clamps were anchored to the center tunnel structure as shown in the photos.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.