Date:  12-27-2010
Number of Hours:  8.00
Manual Reference:  None
Brief Description:  Installed Insulation and ran conduit

Prior to beginning section on baggage floor installation we wanted to run a conduit for the battery cable and other DC power lines along the left side of the aircraft. Soundex insulation was installed prior to routing the conduit. A brackett was fabricated using 6061 .040 to support the exit of the conduit into the tailcone area.