KitLog pro

Powered By Kitlog Pro v2.0

Aviation Partners, LLC Project
' style=
Date:  12-23-2010
Number of Hours:  14.00
Manual Reference:  Page 33-3
Brief Description:  Prepared Baggage Floor Panels for Installation

All parts were picked to begin assembly of the baggage area. Prior to starting any actual construction, we first wanted to create inspection panels above the right and left step attachment nut and bolts in floor panels F-1022A-L and R. A rectangular hole was cut out in the left side F-1023A panel as close to directly over the step attachment bolt and bushing. An inspection panel was created through the use of Vans P/N VA195C & D doubler and panel.

Note:
Since this is a QB kit, page 33-2 was completed by Vans Aircraft and formal assembly begins on Page 33-3
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.