Use a file to radius the top and bottom edges of the E-00001A outboard hinge doubler to nest against the spar radius. Cleco and drill the E-610PP and E-611PP reinforcement plates, E-00001A & B hinge doublers and corresponding platenuts to the E-702 spar.
E-704 counterbalance rib then cleco and drill them to E-702. Remove the ribs from the spar. Place the E-714 counterweight on the forward end of E-703 and E-704 as shown (See View F-F, DWG 5).
Cleco the E-713 counterbalance skin to E-703 and E-704, overtop of E-714. The step in the front face of E-714 should butt against the outboard edge of E-713.
Use the two holes in the forward face of E-713 as a guide and drill #12 the holes for the screws that will hold E-714 in place. Use a drilling lubricant when drilling the lead E-714’s.
Un-cleco E-713, remove and set aside E-714, re-cleco on E-713 to E-703 and E-704. Then cleco the E-703, E-704, E-713 subassembly to E-702.
Cleco the E-705 root rib left to E-702.
Final drill #40, E-705 to E-702.
Cleco E-701-L to the understructure. Note that E-701-L lays on top of E-713.
Remove the clecos connecting E-705 to the E-702 then cleco and drill the WD-605-1-L elevator horn to E-702 and E-705.
Cleco and final drill E-606PP to E-705 (at the root end of the E-606PP spar). Drill the E-701-L skin to the understructure.