KitLog pro

Powered By Kitlog Pro v2.0

Alton's Web Site
' style=
Date:  8-19-2010
Number of Hours:  4.00
Manual Reference:  
Brief Description:  inspection preps.

I finished pulling ALL of the inspection covers.
I finished rigging the ailerons and flaps.
I verified all control surface throws are within spec.
Put some wire clamps on the marker beacon ant.
Bobby Powell looked over my engine compartment. Only one hit, filler tube needed to be a little tighter and re-safetied
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.