KitLog pro

Powered By Kitlog Pro v2.0

Alton's Web Site
' style=
Date:  7-12-2006
Number of Hours:  35.00
Manual Reference:  
Brief Description:  Left Tank Complete

A lot has happened since the last update: We had a 2 month shutdown at work that started the first of April. 8 weeks of 6 twelve hours days leaves no time for airplanes. With that out of the way, it was another month for me to get refocused.My log keeping has been terrible. Basically, I have sealed the left tank up. I would do 1 rib, wait a few days and do another. No hurry here. A leak is bad news.I used capacitance probes and a flop tube. I actually think the capacitance probes make construction easier. I know it will cost me in the end due to the electronics.Other than having proseal on everything, there were no major problems. I did replace the z brackets. I was unhappy with the alignment. I replaced them and switched to Dan Checkoway's method of installing these. THIS IS THE WAY TO GO.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.