KitLog pro

Powered By Kitlog Pro v2.0

Alton's Web Site
' style=
Date:  9-29-2009
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Drilled the gear legs for cotter pins.

Larry dropped by today. We drilled the main gear for the cotter pins. We also installed the new nose wheel contraption to pre-load the bearings. It looks like a pretty nice setup. Maybe I wont flip my RV. Never can tell.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.