Brief Description: Rolling the leading edges of the elevators
It took many tries to get this right, in the end I have a few places where the edge is puckered up, but they are less than a 32nd up and should't have any effect as it will not be exposed. I used a varierty of pipe sizes and techniques. The one that worked best for me was rolling each section seperately starting at the outside(end with the weight) and then working in.
The only elevator work left now is to match drill the horns, tighten the bolts to spec, install a proper length hinge for the trim tab, install the trim servo, and fiber glass the ends.
I am intentionally leaving the fiber glass, match drilling, and bolt tightening to a later stage in the build(years from now).