KitLog pro

Powered By Kitlog Pro v2.0

AARON'S WEB SITE
' style=
Date:  2-14-2012
Number of Hours:  3.50
Manual Reference:  6-7
Brief Description:  Prepped Elevators for riveting

I prepped both of the elevators for the first riveting. This included match drilling the stiffeners and the trim bracket to the skins. Debur, dimple, etc... I was able to do all the work solo with the exception of dimpling the left elevator. I was concerned about the lack of support on the left side and waited until Lisa could help me(it is Valentines Day after all).

I was very careful in my layout of the stiffeners and the trim bracket. They are well marked for reassembly and have already been primed.
' style=

Clecoing the stiffeners on

Clecoing the stiffeners on

' style=

drilling the left elevator

drilling the left elevator

' style=

both elevators ready to rivet

both elevators ready to rivet

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.