KitLog pro

Powered By Kitlog Pro v2.0

AARON'S WEB SITE
' style=
Date:  12-22-2011
Number of Hours:  1.00
Manual Reference:  6-4
Brief Description:  Prep for drilling the VS

It was too cold to work in the garage today. I started on the VS by clecoing the spar doubler to the spar along with the three brackets. I then removed the blue plastic near the holes on the outside of the VS skin.

Tomorow I will be my first tech inspection of the HS, once that is done I should be able to closeup the HS and set it aside.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.