KitLog pro

Powered By Kitlog Pro v2.0

AARON'S WEB SITE
' style=
Date:  11-3-2016
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Passenger footwell rivetting & other misc

Passenger footwell riveted together, rivets the top of the F808 to the lower section including the bracket for the pitot T. I installed the 4 rivets that are under the bell crank rib. Installed and torqued to spec the lower pushtube at the bell crank, then installed and torqued the bolts for the bell crank.

I wired the postive terminals of the two fuel pumps as they will be more difficult to get to once I install the pump onto the support bracket.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.