KitLog pro

Powered By Kitlog Pro v2.0

AARON'S WEB SITE
' style=
Date:  10-15-2013
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Finish riveting of the inner ribs for the left tan

I'm headed out on vacation tomorrow(hopefully filled with flying in the South West). I needed to get the last ~25 rivets done before I could leave the part as the sealant would be too set in a week.

The general method I have been using so far is discussed a few posts back. Once the rivets are driven I used the extra sealant to cap each shop head inside the tanks. I had enough to do 90%, the rest will get capped with the end rib install
' style=

1st pull the cleco and fill the hole with a bit of proseal

1st pull the cleco and fill the hole with a bit of proseal

' style=

next set the rivet in. I used tweezers to pick them up and nest them

next set the rivet in. I used tweezers to pick them up and nest them

' style=

capping the shop head

capping the shop head

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.