Brief Description: Bolted on tie down bracket and bell crank bracket
I spent half an hour with my friend Dave in the garage bolting the tie down bracket onto the spar of the right wing and the upper bell crank bracket. I am waiting on my Dynon bottom bracket that will hold the auto pilot servo to do the bottom. We also spent a lot of time(not recorded) taliking about where and how to run the wires, conduit, and pitot tube(on the other wing).