|
|
|
|
AARON'S WEB SITE
|
Date: 4-24-2012
|
Number of Hours: 1.50
|
Manual Reference: 6-9
|
Brief Description: Drilling the E-714
|
|
I had a lot of trouble with this on the other elevator and I ended up order all new parts for that side. Not wanting to repeat the mistakes I was extra careful with the left elevator counter weight.
It took a lot of tugging, pulling, etc to get the clecos into the holes of the E-713 to E-703/704's. Once I had the counter weight secured in E-703,E-704,E-713 I used a punch to mark where the holes should be drilled in the lead. I then removed the lead, secured it to the drill press and using a #30 with a little Beolube(great stuff!!!) I drilled the holes. I then put it back into the E-703,E-704,E-713 assembly, used a longer #30 and more Beolube to drill through the E-703,E-704, and E-713. I then removed the lead and repeated to whole process but this time with the #12 for the final size.
|
|
the E-703,E-704,E-713 assembly without the lead
|
|
lead and Beolube, #30 drill bit
|
|
lead and Beolube, #12 drill bit
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |