KitLog pro

Powered By Kitlog Pro v2.0

LLOYD'S WEB SITE
' style=
Date:  8-25-2015
Number of Hours:  3.00
Manual Reference:  38-08 & 09
Brief Description:  Completed installation of oil door in upper cowl

Riveted the hinge to the door
Cut doubler to size
Fitted the door to the cowl and located the hinge holes
Riveted the hinge brackets to the cowl
Installed the hinge bolts washers and nuts
' style=

Closed

Closed

' style=

Open

Open

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.