KitLog pro

Powered By Kitlog Pro v2.0

LLOYD'S WEB SITE
' style=
Date:  4-9-2012
Number of Hours:  4.00
Manual Reference:  32-08
Brief Description:  Installed spacers, Worked on fuel system

Installed Spacers on the flaperon torque tubes.
Completed fitting the low pressure side of the fuel system.
Installed the final large fuel filter on the firewall shelf.
Fitted the fuel return line.
' style=

Spacers installed on torque tubes

Spacers installed on torque tubes

' style=

Low pressure side of fuel system

Low pressure side of fuel system

' style=

Final fuel filter on firewall shelf

Final fuel filter on firewall shelf

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.