KitLog pro

Powered By Kitlog Pro v2.0

LLOYD'S WEB SITE
' style=
Date:  10-10-2011
Number of Hours:  8.00
Manual Reference:  32-02,31-03,31-11
Brief Description:  Installing cabling and brake lines

Installed standoff for main cabling. Installed PTT wiring and grips on both control sticks. Temporarily installed sticks in fuselage. Installed brake reservoir. Installed standoff and clamp for brake lines
' style=

Brake line standoff and clamp

Brake line standoff and clamp

' style=

Installed brake reservoir

Installed brake reservoir

' style=

Sticks, grips and PTT

Sticks, grips and PTT

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.