KitLog pro

Powered By Kitlog Pro v2.0

Rogers Web Site
' style=
Date:  10-4-2014
Number of Hours:  2.25
Manual Reference:  8/26-27
Brief Description:  Drilling the port centre skin

Today, I final drilled the #19 holes to full size that are in the lower part of the LG boxes. I also drlled the #30. and #40 holes to full size in the port centre skin.
' style=

Port skin after drilling.

Port skin after drilling.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.