Today, I rolled the leading edges of the rudder and the left elevator. I used a 3/4" iron pipe, about 4' long. It worked wonderfully, I was a little bit nervous about doing this part. I over bent the underside a little too much on a part of the rudder so I asked my wife to help, and what a help she was too. The pipe was too long really for the elevator, the control linkage getting in the way, but it wasn't too much of a hinderance. All in all a good near four hours work I thought.
Lynn after having helped rivet the rolled edge on the rudder