Drilled the C/B weights, both sides. Drilled, beburred, holes for control plates as well as the control plates themselves and the nut plates. riveted the control plates and nut plates to the frame.
End ribs with the C/B weights
Placed frame, less C/B weight to the RH elevator skin ready to drill