KitLog pro

Powered By Kitlog Pro v2.0

Chris RV10 Build
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-25-2017
Number of Hours:  2.00
Manual Reference:  6-2
Brief Description:  Rework

Disassembled rear spar assembly. Spar was previously assembled by previous owner. Upon further inspection flush rivets were setting to high, and button head rivets had smiley's or were improperly set. Spar caps, rear spar, and spar doubler all need rework. Reassembled spar assembly and matched drilled hinge brackets.
' style=





' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.