KitLog pro

Powered By Kitlog Pro v2.0

MAT ISAs Web Site
' style=
Date:  9-17-2007
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Fuselage Prep & blowhole

In preparation of welding the fuselage. All tube joints are clean by amery cloth and rust cleaner. A small hole of 1/16 " was drilled about an inch from the base of the tubing. The small hole will ensure the presurise air inside the tube is release during welding and does not create a blow hole. At a later stage oil will be injected inside the hole to prevent rust and welded close.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.