KitLog pro

Powered By Kitlog Pro v2.0

GOTTFRIED'S WEB SITE
' style=
Date:  8-24-2016
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Bonding last set of doublers

Installed the 4th set of doublers today. By ow it has become a routine.
After the 4th set has been installed, I moved both rotors into the garage where emperatures in summer are alwaysabove 75 degrees to let the adhesive cure for a week.
' style=

mixing the 2 part adhesive and the beads for he last time

mixing the 2 part adhesive and the beads for he last time

' style=

doublers clamped in place for curing

doublers clamped in place for curing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.