KitLog pro

Powered By Kitlog Pro v2.0

GOTTFRIED'S WEB SITE
< Previous Log Entry          Next Log Entry >
' style=
Date:  7-7-2016
Number of Hours:  3.00
Manual Reference:  
Brief Description:  familiarization with rotor blade construction

Kit 2 is still not available from Eagle R&D at this time so they shipped the rotor blades for me to have something to work on. I watched BJ's video on rotor bonding a few times and took notes.
Next I proceeded to located the filler blocks on the blades and clamped and drilled the blocks into position.
' style=

rotor mounting filler block in position

rotor mounting filler block in position

' style=

match drilling of filler block

match drilling of filler block

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.