|
|
|
|
JoeNelsens Web Site
|
Date: 7-8-2016
|
Number of Hours: 15.00
|
Manual Reference:
|
Brief Description: General views of progress
|
|
1) lots of progress shown.Exhaust is installed, air oil seperator in complete installed,p;ug wires run,oil pressure lint installed to engine,
2) More of same shown, RH side.
3) And...again!!...full frontal view. there has to be something here. Please Dont let me know. I want to discover it myself, thank you very much!! God please help me!
At this time, 8-17-16, I have to take more pictures. I have beern working since back from OSH 16, and va-ca to upper Michigan and Lake Superior areas (really nice)! and there has been a failure in the wifes Honda (gasp!..a 278.000+ mile Honda actually has a failure) in the air conditioning system, and I have had to spend time on it. I am late with taking pictures again, but I figure if I take too many pix I wont be working on the plane. So bear...bare...(whatever!) with me as I get going again!
Hopefully engine start will happen by the first week in September, if nothing breaks elsewhere!
|
|
LH side
|
|
RH side
|
|
Frontal
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |