Powered By Kitlog Pro v2.0
Bows Web Site
S-20 Super Raven
Fuselage
10-31-2017
< Previous Log Entry
Next Log Entry >
Date:
10-31-2017
Number of Hours:
9.50
Manual Reference:
Brief Description:
Misc Assy & Paint
Sand prep and spray the kick panels with bed liner, Installed the kick panels per the manual, Sanded the side boot cowl, side doors after laying out the stripes, preped for paint.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Super Raven Home
S-20 Super Raven Home
Category
# Logs
# Hours
All
164
1472
Avionics
12
93
Engine
3
21
Fuselage
78
645
Miscellaneous
19
193
Paint
22
200
Wings
30
320
Copyright © 2001-2024 Matronics. All Rights Reserved.