11-08 The MM-3 bearing was installed onto the pushrod assembly and was threaded until a distance of 16 11/16" was achieved. The servo assembly was installed onto the empennage.
11-09 The servo was fully extended and the distance between the hinges on the ASTs and the stabilator was checked, the MM-3 bearing had to be readjusted to achieve a 1/16 gap between them. WH-P30 was connected and tie-wrapped as instructed.
38-20 The shoulder straps were attached to the fuselage.
38-21 The bottom covers were installed and one of the seats was installed.