Powered By Kitlog Pro v2.0
Bows Web Site
S-20 Super Raven
All
11-8-2017
< Previous Log Entry
Next Log Entry >
Date:
11-8-2017
Number of Hours:
8.50
Manual Reference:
Brief Description:
Misc Assy
Final installed the interior panels, Installed the stick boots, Installed the alternator mounts and unit on the engine to check for clerance issues, Final installed the prop spacer, torqued to spec, saftey wire bolts.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Super Raven Home
S-20 Super Raven Home
Category
# Logs
# Hours
All
164
1472
Avionics
12
93
Engine
3
21
Fuselage
78
645
Miscellaneous
19
193
Paint
22
200
Wings
30
320
Copyright © 2001-2024 Matronics. All Rights Reserved.