Powered By Kitlog Pro v2.0
Bows Web Site
S-20 Super Raven
All
3-22-2017
< Previous Log Entry
Next Log Entry >
Date:
3-22-2017
Number of Hours:
8.00
Manual Reference:
08
Brief Description:
Patches
Continue to work on the items on figure 08A-33 and installed inspection rings and flap, aileron exits cut anf glues patches per the manual. Both RH and LH wings are ready for bottom tapes,
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
S-20 Super Raven Home
S-20 Super Raven Home
Category
# Logs
# Hours
All
164
1472
Avionics
12
93
Engine
3
21
Fuselage
78
645
Miscellaneous
19
193
Paint
22
200
Wings
30
320
Copyright © 2001-2024 Matronics. All Rights Reserved.