Began machine work on the spacer that will go between the starter ring gear and the 36-1 tooth timing ring. Cut the space from a 4" diameter bar of 6061 T6 aluminum. Got one side faced and the 6 mounting bolt holes located.
Also spent some time with determining hte best location for the carburetor.