KitLog pro

Powered By Kitlog Pro v2.0

Dave Yost RV-4
Work Logs Found: 26
Category Work Time: 106 Hours
 Date
Hours
Work Log Summary

Details

 06-18-2019
1.00

Details

 11-03-2013
15.00
Rudder Structure
       

 02-03-2013
1.00
Bio: Dave Yost
Details
       

 02-02-2013
1.00
Prepairing the elevator bearing bracket
Details
       

 01-30-2013
2.00
Horizontal Stab Begins!
Details
       

 08-29-2012
6.00
Final finish on the fiberglass tip. Vertical stab
Details
       

 08-29-2012
3.00
Fiberglass tip final install
Details
       

 08-25-2012
8.00
VS Stab fiberglass tip.
Details
       

 08-21-2012
8.00
Final Assembly of the Vertical Stab!
Details
       

 08-20-2012
4.00
Riveting begins!
Details
       

 08-15-2012
7.00
Priming
Details
       

 08-12-2012
0.50
Handy Tips
Details
       

 08-07-2012
4.00
Deburring and Dimpling
Details
       

 08-05-2012
4.00
Match Drilling Complete!
Details
       

 08-02-2012
12.00
Match Drilling the Vertical Stab Skin
Details
       

 08-01-2012
7.00
Vertical Stab Fixture
Details
       

 07-29-2012
5.00
Building the structure
Details
       

 07-28-2012
2.00
Triming the bottom of the Vertical Stab T.E. spar
       

 07-10-2012
3.00
Fixing the Hinge Brackets
Details
       

 07-05-2012
6.00
Hinge layout on Vertical Stab T.E. Spar
Details
       

 07-05-2012
0.30
Cutting the "V" in VS408
Details
       

 07-03-2012
1.00
Rudder and Stab T.E. Spar Hinge Line
Details
       

 07-03-2012
0.50
Locating Center Line of VS408
Details
     

 07-03-2012
0.50
Drilling 1/2" hole on center line of "V" cut out.
     

 07-03-2012
3.00
Blue Sharpie and a Mic.
Details
     

 07-03-2003
1.00
VS408 Layout
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.