KitLog pro

Powered By Kitlog Pro v2.0

TAB Aircraft LLC Web Site
269 Logs Found 
 Date
Hours
Work Log Summary

Details

 05-18-2013
1.0
Page 246 Making Instrument Panel Extension
Details
       

 05-17-2013
2.0
Page 245 Mine is better than yours
Details
       

 05-16-2013
0.0
Page 244 Tell me I can't have that
Details
       

 05-15-2013
0.1
Page 243 Installing Flap Position Sensor 2
Details
       

 05-14-2013
0.3
Page 242 Installing Flap Position Sensor 1
Details
       

 05-12-2013
0.0
Video Test/Bowden's Landing Fly-In
Details

 05-11-2013
1.0
Page 241 Strengthening Battery Tray attachment
Details
       

 05-10-2013
1.0
Page 240 Making room for a 2nd Battery
Details
       

 05-03-2013
0.0
Page 239 Got my Goodies Today
Details
       

 05-01-2013
0.0
Page 238 Ordered Avionics from Aircraft Spruce
Details

 04-25-2013
1.0
Page 237 Carpeted Mega Hatch Door
Details
       

 04-25-2013
0.3
Page 236 Re-glued carpet around windows
Details
       

 04-24-2013
1.0
Page 235 Installed Flap Slave Arm
Details
       

 04-24-2013
1.0
Page 234 Installed Aileron Tie Rod Tube
Details
     

 04-23-2013
0.8
Page 233 Installed Aft Boom Tube Cover
Details
       

 04-22-2013
1.0
Page 232 Attaching Turtle Deck Upholstery
Details
       

 04-21-2013
1.0
Page 231 Attaching Turtle Deck Upholstery
Details
       

 04-20-2013
0.3
Page 230 Installed Weathersealbfor Small Hatch
Details
       

 04-19-2013
0.5
Page 229 Installing an Edge Guard
Details
       

 04-15-2013
2.0
Page 228 Installed Navigation Lights
Details
       

 04-08-2013
1.0
Page 227 The Last of the Decals
Details
       

 04-08-2013
1.0
Page 226 Installed the Side Molding
Details
       

 04-08-2013
0.8
Page 225 Installed all the Cotter Pins
Details
     

 04-02-2013
1.5
Page 224 Installed the Aileron Control Horns
Details
       

 04-02-2013
1.0
Page 223 Installed Decals on bottom side of wing
Details
       

 03-31-2013
6.0
Page 222 Pinstripes
Details
       

 03-29-2013
1.0
Page 221 Strut Assembly 2
Details
       

 03-28-2013
0.5
Page 220 Strut Assembly 1
Details
       

 03-27-2013
1.0
Page 219 Sponson Assembly 2
Details
       

 03-26-2013
1.0
Page 218 Sponson Assembly 1
Details
       

 03-25-2013
1.0
Page 217 Installed Gap Seal Attach Angles
Details
       

 03-24-2013
0.5
Page 216 Installed Weatherseal on Window Hatch
Details
       

 03-23-2013
0.5
Page 215 Installed Weatherseal on Mega Hatch
Details
       

 03-20-2013
1.0
Page 214 Installed Decals on top side of the wing
Details
       

 03-19-2013
2.0
Page 213 Installing Gap Seals 4
Details
       

 03-18-2013
4.0
Page 212 Installing Gap Seals 3
Details
       

 03-17-2013
2.0
Page 211 Installing Gap Seals 2
Details
       

 03-16-2013
8.0
Page 210 Installing Gap Seals 1
Details
       

 03-15-2013
2.0
Page 209 Making a Luxury Dash
Details
       

 03-14-2013
0.5
Page 208 Played with the LSX Interior
Details
       

 03-13-2013
1.5
Page 207 Installed Wing Hinges
Details
       

 03-12-2013
1.0
Page 206 Installed the Aileron Torque Tube Horn
Details
       

 03-11-2013
0.0
Page 205 Daytona Bike Week
Details
       

 03-10-2013
0.5
Page 204 Installed Decals
Details
       

 03-09-2013
1.5
Page 203 Installed Aileron and Flap Hinges
Details
       

 03-08-2013
1.0
Page 202 Riveting the Root Gap Seal underside
Details
       

 03-07-2013
3.0
Page 201 Installing the Stabilizer Root Gap Seal
Details
       

 03-06-2013
3.0
Page 200 Installing Control Horn on the Elevator
Details
       

 02-28-2013
0.5
Page 199 Securing the Rudder Cables
Details
       

 02-27-2013
1.0
Page 198 Installing the Stabilizer to the Bracket
Details
       

 02-26-2013
2.0
Page 197 Installing the Vertical Fin Forward Cove
Details
       

 02-25-2013
0.0
Page 196 Ramp Repair
Details
       

 02-24-2013
0.0
Page 195 Ramp Repair
Details
       

 02-23-2013
1.0
Page 194 Rudder Final Finishes
Details
       

 02-22-2013
0.5
Page 193 Vertical Fin Final Finishes
Details
       

 02-21-2013
1.0
Page 192 Adding some Bling
Details
       

 02-20-2013
0.0
Page 191 Homecoming from the Paint Shop
Details
       

 02-19-2013
1.5
Page 190 The Devil is in the details
Details
       

 02-18-2013
0.0
Page 189 Getting Ready for the Homecoming
Details
       

 02-17-2013
0.0
Page 188 Visit to the Paint Shop 13
Details
       

 02-16-2013
0.0
Page 187 Visit to the Paint Shop 12
Details
       

 02-15-2013
0.0
Page 186 Visit to the Paint Shop 11
Details
       

 02-14-2013
0.0
Page 185 Spouse/Girlfriend gets a new car
Details
       

 02-13-2013
0.0
Page 184 Visit to the Paint Shop 10
Details
       

 02-12-2013
0.0
Page 183 Visit to the Paint Shop 9
Details
       

 02-11-2013
0.0
Page 182 Visit to the Paint Shop 8
Details
       

 02-10-2013
0.0
Page 181 Visit to the Paint Shop 7
Details
       

 02-09-2013
0.0
Page 180 Visit to the Paint Shop 6
Details
       

 02-08-2013
0.0
Page 179 Bummed about the Paint Job
Details
       

 02-07-2013
2.0
Page 178 Installing the Gap Seals
Details
       

 02-06-2013
0.0
Page 177 Visit to the Paint Shop 5
Details
       

 02-05-2013
0.0
Page 176 Visit to the Paint Shop 4
Details
       

 02-04-2013
0.0
Page 175 Cleaning up the Shop
Details
     

 02-03-2013
0.0
Page 174 Visit to the Paint Shop 3
Details
       

 02-02-2013
0.0
Page 173 Visit to the Paint Shop 2
Details
       

 02-01-2013
0.0
Page 172 Visit to the Factory
Details
       

 01-31-2013
0.0
Page 171 Visit to the Paint Shop 1
Details
       

 01-30-2013
0.0
Page 170 SOMEONE TOOK MY SEAREY
Details
       

 01-29-2013
0.0
Page 169 Got my Interior Panels
Details
       

 01-28-2013
1.0
Page 168 Getting Ready to Paint 8
Details
       

 01-27-2013
0.0
Page 167 Getting Ready to Paint 7
Details
       

 01-26-2013
1.0
Page 166 Getting Ready to Paint 6
Details
       

 01-25-2013
3.0
Page 165 Getting Ready to Paint 5
Details
       

 01-24-2013
1.0
Page 164 Getting Ready to Paint 4
Details
       

 01-23-2013
0.0
Page 163 Not Me Too! You Ass!
Details
       

 01-22-2013
2.0
Page 162 Getting Ready to Paint 3
Details
     

 01-21-2013
1.0
Page 161 Getting Ready for a Viking
Details
       

 01-20-2013
2.0
Page 160 Getting Ready to Paint 2
Details
       

 01-19-2013
1.0
Page 159 Getting Ready to Paint 1
Details
       

 01-18-2013
0.0
Page 158 A Viking at the Show
Details
       

 01-17-2013
0.0
Page 157 A Day at the Sebring LSA Show
Details
       

 01-16-2013
2.0
Page 156 Making the Mega Hatch Pretty
Details
       

 01-12-2013
2.0
Page 155 Bulkhead Tube Hull Reinforcement 2
Details
       

 01-11-2013
6.0
Page 154 Bulkhead Tube Hull Reinforcement 1
Details
       

 01-10-2013
1.0
Page 153 Installed the 914 Root Tube
Details
       

 01-09-2013
2.0
Page 152 Looking for stuff to do
Details
       

 01-08-2013
0.0
Page 151 A Trip to the SeaRey Factory again 2
Details
       

 01-07-2013
0.0
Page 150 A Trip to the SeaRey Factory again 1
Details
       

 01-06-2013
0.5
Page 149 Installed the Rudder Foot Pad
Details
       

 01-05-2013
1.0
Page 148 Installed the Bow Eye
Details
       

 01-03-2013
1.0
Page 147 Temporally Installing the Console 8
Details
     

 01-02-2013
0.0
Page 146 A Trip to the SeaRey Factory 3
Details
       

 01-01-2013
0.0
Page 145 A Trip to the SeaRey Factory 2
Details
       

 12-31-2012
0.0
Page 144 A Trip to the SeaRey Factory 1
Details
       

 12-30-2012
2.0
Page 143 Temporally Installing the Console 7
Details
       

 12-29-2012
1.0
Page 142 Temporally Installing the Console 6
Details
       

 12-28-2012
0.5
Page 141 Temporally Installing the Console 5
Details
       

 12-27-2012
1.0
Page 140 Temporally Installing the Console 4
Details
       

 12-26-2012
2.0
Page 139 Temporally Installing the Console 3
Details
       

 12-25-2012
1.0
Page 138 Temporally Installing the Console 2
Details
       

 12-24-2012
2.0
Page 137 Temporally Installing the Console 1
Details
       

 12-23-2012
2.0
Page 136 Getting Nose Deck ready for the Panel
Details
       

 12-22-2012
1.0
Page 135 Installing Bulkhead Support 3
Details
       

 12-21-2012
1.0
Page 134 Installing Bulkhead Support 2
Details
       

 12-20-2012
1.0
Page 133 Fiberglass Repair
Details
     

 12-19-2012
2.0
Page 132 Installing Bulkhead Support 1
Details
       

 12-18-2012
1.5
Page 131 Installed Root Support Mounting Angle
Details
       

 12-17-2012
4.0
Page 130 Installed the 3" Linear Tape on the Seam
Details
       

 12-14-2012
3.0
Page 129 Covering the Vertical Stabilizer
Details
       

 12-13-2012
3.0
Page 128 Installing the Pylon Side Covers
Details
       

 12-12-2012
2.0
Page 127 Preparing the Pylon Side Covers 6
Details
       

 12-11-2012
1.5
Page 126 Replacing the damaged Side Cover
Details
       

 12-10-2012
1.0
Page 125 Installing Seat Back Stops
Details
       

 12-09-2012
0.5
Page 124 DISASTER!
Details
       

 12-08-2012
2.0
Page 123 Preparing the Pylon Side Covers 5
Details
     

 12-07-2012
1.0
Page 122 Preparing the Pylon Side Covers 4
Details
       

 12-06-2012
1.0
Page 121 Preparing the Pylon Side Covers 3
Details
       

 12-05-2012
1.0
Page 120 Preparing the Pylon Side Covers 2
Details
       

 12-04-2012
2.0
Page 119 Preparing the Pylon Side Covers 1
Details
       

 12-03-2012
3.0
Page 118 Fitting the Pylon Side Covers
Details
       

 12-02-2012
4.0
Page 117 Making the Hole for the Flap Slave Horn
Details
       

 12-01-2012
3.0
Page 116 Installing the Pylon Side Covers
Details
       

 11-30-2012
0.5
Page 115 Caulked around the Rear Pylon Support
Details
     

 11-29-2012
3.0
Page 114 Covering the Vertical Stabilizer
Details
       

 11-28-2012
2.0
Page 113 Installed Fuel Sump System
Details
       

 11-27-2012
7.0
Page 112 Installed the Splash Guard continued
Details
       

 11-26-2012
1.0
Page 111 Installation of the Hull Side Angles
Details
       

 11-25-2012
2.0
Page 110 Installation of the Splash Guard
Details
       

 11-24-2012
1.0
Page 109 Installed the Expansion Plates
Details
       

 11-23-2012
2.0
Page 108 Installation of the Expansion Plates
Details
       

 11-22-2012
4.0
Page 107 Installed the Pylon Angles
Details
       

 11-21-2012
1.0
Page 106 It's not Me, It's You.
Details
       

 11-20-2012
0.0
Page 105 This don't look right
Details
       

 11-19-2012
4.0
Page 104 Installation of the Boom Tube Covers
Details
       

 11-18-2012
0.0
Page 103 BUSTED
Details
       

 11-17-2012
2.0
Page 102 Assembly of the Electric Flap Actuator
Details
       

 11-16-2012
2.0
Page 101 Attaching the Root Tube to the Supports
Details
       

 11-15-2012
2.0
Page 100 Setting the Turtle Deck into Place
Details
       

 11-14-2012
2.0
Page 99 Preparing the Fuel Fill Connection Part 4
Details
       

 11-11-2012
0.0
Page 98 3rd Annual SeaRey Fly-in
Details
       

 11-05-2012
4.0
Page 97 Carpeting the inside of the Turtle Deck
Details
       

 11-04-2012
1.0
Page 96 Carpeting the inside of the Turtle Deck
Details
       

 11-01-2012
5.0
Page 95 Preparing the Turtle Deck Part 4
Details
       

 10-20-2012
0.0
Page 94 Daytona Biketoberfest 2012
Details
       

 10-19-2012
1.0
Page 93 Preparing the Fuel Fill Connection Part 3
Details
       

 10-18-2012
1.0
Page 92 Preparing the Fuel Fill Connection Part 2
Details
       

 10-16-2012
4.0
Page 91 Preparing the Turtle Deck Part 3
Details
       

 10-06-2012
0.0
Page 90 Preparing the Fuel Fill Connection Part 1
Details
       

 10-05-2012
0.0
Page 89 Bowden's Landing Improvements cont.
Details
       

 10-04-2012
0.0
Page 88 Bowden's Landing Improvements
Details
       

 10-03-2012
1.0
Page 87 Preparing the Turtle Deck Part 2
Details
       

 10-02-2012
1.0
Page 86 Hull Rivet Reinforcement Continued
Details
       

 09-30-2012
0.0
Page 85 The Mega Hatch
Details
       

 09-29-2012
3.0
Page 84 Preparing the Turtle Deck Part 1
Details
       

 09-28-2012
2.0
Page 83 LSX Seat Installatoin
Details
       

 09-27-2012
2.0
Page 82 Turtle Deck Bulkhead Part 4
Details
       

 09-26-2012
1.0
Page 81 Turtle Deck Bulkhead Part 3
Details
       

 09-25-2012
2.0
Page 80 Turtle Deck Bulkhead Part 2
Details
       

 09-24-2012
2.0
Page 79 Turtle Deck Bulkhead Part 1
Details
       

 09-20-2012
0.8
Page 78 LSX Seat Hardware and Heater Hoses
Details
       

 09-19-2012
1.5
Page 77 Installing Trim Position Sensor
Details
       

 09-19-2012
2.0
Page 76 Installing Tosten Aircraft Grips
Details
       

 09-16-2012
2.0
Page 75 Installing the Stow-n-Go Hatch Part 4
Details
       

 09-15-2012
2.0
Page 74 Hull Rivet Reinforcement
Details
       

 09-14-2012
1.0
Page 73 Repair a mistake
Details
       

 09-13-2012
4.0
Page 72 Installing the Stow-n-Go Hatch Part 3
Details
       

 09-12-2012
4.0
Page 71 Installing the Stow-n-Go Hatch Part 2
Details
       

 09-11-2012
4.0
Page 70 Installing the Stow-n-Go Hatch Part 1
Details
       

 09-10-2012
2.0
Page 69 Temporarily installed Turtle Deck
Details
       

 09-09-2012
2.0
Page 68 Installing the Micro Switches
Details
       

 09-08-2012
1.0
Page 67 Brake Line Routing Part 4
Details
       

 09-07-2012
0.5
Page 66 Installation of the Battery Hold-Down
Details
       

 09-06-2012
0.5
Page 65 Brake Line Routing Part 3
Details
       

 09-05-2012
2.0
Page 64 Brake Line Routing Part 2
Details
       

 09-04-2012
1.0
Page 63 Brake Line Routing Part 1
Details
       

 09-03-2012
3.0
Page 62 Assembly of the Axle to the Main Gear Leg
Details
       

 09-02-2012
3.0
Page 61 Electric Landing Gear Assembly Continued
Details
       

 09-01-2012
4.0
Page 60 Electric Landing Gear Assembly
Details
       

 08-31-2012
4.0
Page 59 Installation of the Throttle Assembly
Details
       

 08-30-2012
0.5
Page 58 Installing Bushings Part 3
Details
       

 08-29-2012
5.5
Page 57 Installed Tail Wheel Retraction Spring
Details
       

 08-28-2012
1.0
Page 56 Installing Bushings Part 2
Details
       

 08-27-2012
3.0
Page 55 Assembly of the Control Sticks
Details
       

 08-22-2012
1.0
Page 54 Installing Bushings Part 1
Details
       

 08-21-2012
3.0
Page 53 Assembly of the Electric Trim Actuator
Details
       

 08-20-2012
1.0
Page 52 Tail Wheel Retract Cable Protection
Details
       

 08-19-2012
1.0
Page 51 Tail Wheel Assembly Continued
Details
       

 08-18-2012
2.0
Page 50 Tail Wheel Assembly
Details
       

 08-17-2012
2.0
Page 49 Tail Fin Assembly
Details
       

 08-16-2012
2.0
Page 48 Connecting the Elevator Push Pull Rod
Details
       

 08-15-2012
3.0
Page 47 Permanently Attaching Airframe to Hull
Details
       

 08-14-2012
2.0
Page 46 Adding Heater Piping
Details
       

 08-13-2012
3.0
Page 45 Forward Cockpit Part 2
Details
       

 08-12-2012
2.0
Page 44 Attaching the Rubber Seals
Details
       

 08-11-2012
1.0
Page 43 Installation of the Bilge Pump
Details
       

 08-10-2012
3.0
Page 42 Installation of Carpeting into Hull
Details
       

 08-09-2012
0.5
Page 41 Repairing the Gap in the Hull
Details
       

 08-08-2012
2.0
Page 40 Painting the Fuel Tank
Details
       

 08-07-2012
1.0
Page 39 Patching the gap
Details
       

 08-06-2012
2.0
Page 38 Cut the Gear Leg Opening
Details
       

 08-05-2012
2.0
Page 37 Drilling the Hull Stringers
Details
       

 08-04-2012
2.0
Page 36 Fiberglass Patching
Details
       

 08-03-2012
2.0
Page 35 Test Setting the Turtle Deck
Details
       

 08-02-2012
1.0
Page 34 Checking the Fit Again
Details
       

 08-01-2012
2.0
Page 33 Cutting the Reinforcements
Details
       

 07-31-2012
1.0
Page 32 Checking the Airframe Fit
Details
       

 07-30-2012
2.0
Page 31 Cutting Down the Stringer
Details
       

 07-29-2012
3.0
Page 30 Airframe to Hull Stringer Reinforcment
Details
       

 07-28-2012
3.0
Page 29 Applying the Fiberglass
Details
       

 07-27-2012
2.0
Page 28 Gluing the foam to the Hull
Details
       

 07-26-2012
1.0
Page 27 Adding Foam Reiforcment
Details
       

 07-25-2012
2.0
Page 26 Reinforcing the Hull Step
Details
       

 07-24-2012
1.0
Page 25 Actuator Plate Replacment
Details
       

 07-23-2012
3.0
Page 24 Beefing Up the Rear Actuator Plate
Details
       

 07-22-2012
3.0
Page 23 Cutting the Hull for the Airframe
Details
       

 07-21-2012
0.0
Page 22 A vist to tha EAA Hanger
Details
       

 07-20-2012
2.0
Page 21 Assembly of the Axle
Details
       

 07-19-2012
1.0
Page 20 Installing KeelGaurd
Details
       

 07-18-2012
1.0
Page 19 At a Stand Still / Wheel Assembly
Details
       

 07-17-2012
1.5
Page 18 Installed Fuel Level Sender
Details
     

 07-15-2012
1.5
Page 17 Installation of the Fuel Tank Strap
Details
       

 07-14-2012
2.0
Page 16 Installing the Rear Fuel Tank Angle
Details
       

 07-13-2012
1.0
Page 15 Fuel Tank Cleaning July 12 2012
Details
       

 07-12-2012
0.7
Page 14 Forward Fuel Tank Angle
Details
       

 07-11-2012
2.0
Page 13 Installing the Boom Tube
Details
       

 07-10-2012
3.0
Page 12 Fuselage Aft Assembly
Details
       

 07-09-2012
2.9
Page 11 Forward Cockpit Assembly July 9 2012
Details
       

 07-08-2012
3.3
Page 10 Bulkhead Assembly July 8 2012
Details
       

 07-07-2012
0.0
Page 9 Bill all moved out :( , July 5 2012
Details
       

 07-06-2012
1.0
Page 8 Bulkhead Assembly, July 4 2012
Details
       

 07-05-2012
3.0
Page 7 The Build Begins, July 4 2012
Details
       

 07-04-2012
0.0
Page 6 Get the wings off the floor
Details
       

 07-03-2012
0.0
Page 5 The day finally arrived. The Kit Delivery.
Details
       

 06-21-2012
0.0
Page 4 Wing Storage Hoist Motor
Details
       

 06-10-2012
0.0
Page 3 Wing Storage Hoist
Details
       

 05-30-2012
0.0
Page 2 Looking around Recreational Mobility
Details
       

 05-29-2012
0.0
Page 1 And so it begins. Purchased Searey Kit
Details
       

 01-16-2012
0.0
Bills Kit Page 22
Details
       

 01-14-2012
0.0
Bills Kit Page 21
Details
       

 01-11-2012
0.0
Bills Kit Page 20
Details
       

 12-30-2011
0.0
Putting the frame into the hull Page19
Details
       

 12-19-2011
0.0
Almost ready to put the frame in the Hull Page 18
Details
       

 12-10-2011
0.0
Installed Boom Tube and Gas Tank Page 17
Details
       

 12-02-2011
0.0
The Build Begins Page 16
Details
       

 11-26-2011
0.0
Getting Ready For the Build Page 15
Details
       

 11-19-2011
0.0
Kit in the Garagemahal Page 14
Details
       

 11-18-2011
0.0
Picking Up The Kit at PA Page 13
Details
       

 11-17-2011
0.0
2nd Annual SeaRey Inaugural Flight Anniversary Fly
Details
       

 10-31-2011
0.0
Garage? Hanger? Shop? Yes. Page 11
Details
       

 10-30-2011
0.0
Getting the Garage Ready for a Build Page 10
Details
       

 11-22-2010
0.0
1st Annual SeaRey Inaugural Flight Anniversary Fly
Details
     

 10-28-2010
0.0
Still Waiting Page 8
Details
     

 03-15-2010
0.0
Bowden's Landing Page 7
Details
       

 03-14-2010
0.0
First Fly-In at Bowden's Landing Page 6
Details
       

 01-29-2010
0.0
A New Year Page 5
Details
       

 08-19-2009
0.0
SeaRey in Action Page 4
Details
       

 08-12-2009
0.0
My Story So Far Page 3
Details
       

 07-30-2009
0.0
My Story So Far Page 2
Details
       

 07-29-2009
0.0
My Story So Far Page 1
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.