Mikes RANS S-19 Project
S-19 Venterra
All
104 Logs Found
Date
Hours
Work Log Summary
Details
05-12-2013
2.0
Deburred, Removed Oxidation from Skin
Details
04-29-2013
1.5
Continued Removing Protective Film
Details
04-28-2013
1.5
Removed Protective Film from Skins
Details
04-27-2013
1.0
Removed Rear Stabilator Skins
Details
04-26-2013
1.5
Finished Hinge Fabrication
Details
04-25-2013
1.0
Fabricated Trim Tab Hinge Pins
Details
04-20-2013
1.0
Deburred and Smoothed Forward Ribs
Details
04-20-2013
2.0
Deburred and Cleaned Forward Skins
Details
04-20-2013
1.3
Added Hole to Left Bottom Forward Skin
Details
04-18-2013
0.8
Deburred Forward Left Skin
Details
04-15-2013
0.5
Removed Tangs from Stabilator Bottom Skins
Details
04-15-2013
1.0
Deburred Right Forward Stabilator Skin
Details
04-14-2013
0.8
Mounted Right Trim Tab Hinge
Details
04-14-2013
0.8
Checked Fit, Operation on Trim Tab Hinges
Details
04-13-2013
0.8
Mounted Left Trim Tab Hinge
Details
04-12-2013
1.0
Trimmed Tangs on Top Aft Skins
Details
04-12-2013
1.0
Installed Trim Tab Center Hinge
Details
04-10-2013
0.8
Fabricated Servo Tab Hinges
Details
04-09-2013
1.0
Finished Drilling & Clecoing #30 Stabilator Top
Details
04-08-2013
0.8
Drilled and Clecoed #30 Stabilator Top Right
Details
04-07-2013
0.5
Drilled and Clecoed #30 HS Top Forward Skin
Details
04-07-2013
0.3
Compliance with Assembly Alert # 168
Details
04-06-2013
3.0
Drilled and Clecoed Left Forward Skin to Ribs
Details
04-06-2013
2.0
Drilled and Clecoed #30 Stabilator Bottom
Details
04-03-2013
2.0
Drilled and Clecoed Right Forward Skin to Ribs
Details
04-03-2013
0.0
Drilled and Clecoed Right Forward Skin to Ribs
Details
04-02-2013
1.0
Drilled and Clecoed Trailing Edges of Forward Skin
Details
04-01-2013
1.0
Aligned HS Jig in Vertical Plane
Details
10-11-2009
3.0
Clecoed Forward Skins--Top Side
Details
10-10-2009
0.5
Fabricated Stabilator Center Support
Details
10-06-2009
1.5
Rounded Forward Rib Noses
Details
10-05-2009
0.5
Transferred Spar Flange Lines
Details
10-04-2009
1.0
Drilled and Clecoed Stabilator Horns
Details
10-03-2009
1.5
Clecoed Bottom Left Skin
Details
09-23-2009
1.5
Clecoed Bottom Right Skin
Details
09-21-2009
4.0
Transfer Drilled Top Skin to Ribs
Details
09-20-2009
1.5
Cleco Aft Skins to Rear Spar
Details
09-19-2009
1.0
Fabricated and Installed Skin Stiffeners
Details
09-18-2009
1.0
Modified Stabilator Plates
Details
08-17-2009
1.0
Stabilator Spar Bar Spacers
Details
08-16-2009
0.0
Preparing Rear Stabilator Skins
Details
08-15-2009
0.0
Stabilator in Jig
Details
08-14-2009
0.3
Cut Rear Spar Support Blocks
Details
08-13-2009
0.8
Fastened Rear Spar to Jig
Details
08-12-2009
0.3
Installed Stabilator Spar Bars
Details
08-11-2009
0.5
Fastened Front Spar to Jig
Details
08-10-2009
0.5
Assemble Stabilator Jig
Details
08-09-2009
3.0
Assembled Stabilator Frame
Details
08-08-2009
1.0
Stabilator Main Spar Angles
Details
08-07-2009
1.0
Rounded Stabilator Spar Bars
Details
08-06-2009
0.5
Stabilator Rib Preparation
Details
05-19-2009
0.0
Finished Vertical Stabilizer!
Details
05-14-2009
0.5
Riveted the Tip Fairing to the VS
Details
05-14-2009
0.5
Fabricated VS Tip Fairing
Details
04-10-2009
2.0
Added Shims to VS Forward Rib #5
Details
04-06-2009
1.5
Riveted VS Skins to VS Frame
Details
03-28-2009
5.0
Fitted Forward Skin Over Forward Ribs
Details
03-27-2009
1.0
Prepare to Install Forward Skin
Details
03-25-2009
1.0
Added Additional VS Skin Stiffener
Details
03-23-2009
1.5
Clecoed Side Skins to Frame
Details
03-16-2009
0.5
Clecoed VS Skin Stiffeners to Skins
Details
03-15-2009
0.3
VS Skin Stiffeners--Fluting
Details
03-15-2009
0.8
Fabricated Vertical Stabilizer Skin Stiffeners
Details
01-01-2009
0.3
Verify VS Frame is Flat With Table
Details
01-01-2009
0.5
Verify Ribs Are Flat
Details
01-01-2009
0.3
Mark Rib Centerlines
Details
12-30-2008
2.0
Completed Vertical Stabilizer Frame
Details
12-29-2008
1.0
Vertical Stabilizer Side Skins
Details
12-27-2008
2.0
Continued Work on Rear Spar
Details
12-26-2008
4.0
Rear Spar Assembly
Details
12-21-2008
2.0
Riveted Front Spar Assembly
Details
12-20-2008
2.0
Primed the Front Spar Parts
Details
10-18-2008
3.0
Continued Front Spar Assembly
Details
10-17-2008
4.0
Assembled Front Spar Assembly
Details
09-30-2008
1.5
Completed Rudder
Details
09-28-2008
0.5
Reassembled Rudder--Ready to Rivet
Details
09-28-2008
2.0
Deburred and Primed Interior Skins
Details
09-24-2008
1.0
Clecoed Rudder Skins to Frame
Details
09-24-2008
1.0
Clecoed Rudder Skin to Work Table
Details
09-24-2008
1.0
Clecoed All Rudder Parts
Details
09-24-2008
1.0
Attach Skins to Rudder Bending Jig
Details
08-18-2008
2.0
Transfer Drilled Rudder
Details
08-16-2008
1.0
Rudder Strap
Details
08-15-2008
1.0
Transfer Drilled and Clecoed Trailing Edge
Details
08-15-2008
1.0
Setup Rudder Jig
Details
08-15-2008
2.0
Rudder Skin Stiffeners
Details
08-15-2008
1.0
Enhanced Rudder Jig
Details
08-10-2008
3.0
Assembled Rudder Frame
Details
08-09-2008
3.0
First Mistake!
Details
07-29-2008
2.0
Primed Rudder Frame Components
Details
07-25-2008
3.0
Rudder Frame Edge Finishing
Details
06-14-2008
1.5
Deburred and Cleco'ed Rudder Frame
Details
06-13-2008
0.0
Burraway De-burring Tool
Details
06-12-2008
1.0
Transfer Drilled #30 Holes in Rudder Frame
Details
06-06-2008
1.0
Installed Flange Bushing in Rudder Torque Tube
Details
06-04-2008
0.3
Installed Flange Bushings in Rudder Hinges
Details
06-04-2008
0.8
Fit and Trimmed Flange Bushing
Details
06-04-2008
1.0
Drilled and Cleaned Rudder Torque Tube
Details
06-03-2008
0.5
Identified All Rudder Parts
Details
05-23-2008
0.5
Received Empennage Kit
Details
05-23-2008
2.0
Inventoried Empennage Kit
Details
05-21-2008
0.0
Work Table -- 4 x 12 feet
Details
05-05-2008
0.0
Received Tony Bingelis Books
Details
04-21-2008
0.0
Ordered Empennage Kit from RANS.
Details
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
All
Empennage
Reference Materials
Rudder
Stabilator
Tools
Vertical Stabilizer
Worktable
Copyright © 2001-2013 Matronics. All Rights Reserved.