KitLog pro

Powered By Kitlog Pro v2.0

RV12 Kit Web Site
Work Logs Found: 44
Category Work Time: 132 Hours
 Date
Hours
Work Log Summary

Details

 08-20-2012
1.50
Trim servo wire connectors
Details
       

 02-24-2012
1.00
Trim bracket update
Details
       

 02-16-2011
3.50
Fitting Horizontal Stabilator to Tail Cone
Details
       

 01-16-2011
1.50
Temporarily Attach Rudder
Details
       

 01-12-2011
2.50
Attach Verticle Stabilator to Tail Cone
Details
       

 01-11-2011
3.00
Finish Rivet Tail Cone

 01-05-2011
0.50
Clecoed Top Rib to Top Skin for Rudder Atachment.
Details
       

 01-05-2011
0.50
Added Skin Doubler to Top Skin.
Details
     

 01-04-2011
4.50
Top Skin Clecoed on.
Details
       

 11-18-2010
2.45
Upper right skin attached.
Details
       

 11-18-2010
2.50
Install Static Ports
Details
     

 11-16-2010
3.25
Clecoed the upper left side skin
Details
       

 11-15-2010
1.00
Ran control line strings and Trim wiring.
Details
       

 11-15-2010
2.50
Install right and left static ports.
Details
       

 11-12-2010
1.50
Replace 2 rivets and cleco Bulkhead to Empanage
Details

 07-11-2010
0.05

     

 07-10-2010
8.50
Start assembly of tailcone area
Details
       

 07-08-2010
3.50
Attached stiffiners to bottom tailcone skins
Details

 06-29-2010
2.50
Bulkhead for rear of tailcone
Details
       

 06-27-2010
1.50
Forward Skin Rib
Details
       

 06-25-2010
2.50
Started to asemble the skeleton of the tail cone.
Details
       

 06-25-2010
3.00
Match drill AFT hinges and finish rivets
Details
       

 06-23-2010
3.00
More deburring to do.
Details
       

 06-22-2010
3.00
Replacement Hinges
Details
     

 06-15-2010
1.50
Counter ballance arm and weights.
Details
     

 06-11-2010
5.00
Prepped small parts for Tail Cone
Details
       

 06-11-2010
0.00
Laid out Tail Cone parts
Details
     

 06-07-2010
6.50
Cleco skin to horizontal stabilizer and begin rive
Details
       

 06-05-2010
7.50
Horizontal Stabilizer
Details
       

 06-03-2010
5.50
Spar Box for Horizontal Stabilizer
Details
       

 05-31-2010
2.50
Anti Servo Tab
Details
       

 05-21-2010
3.50
AST Half Done
Details
       

 05-19-2010
3.00
AST
Details

 05-17-2010
6.50
Rudder assembly
Details
       

 05-14-2010
1.50
Repair nutplate for front skin of Tail.
Details
       

 05-13-2010
4.00
Rivet Tail Skin to skeleton
Details
     

 05-11-2010
3.50
Dimple tail skins and final drill.
Details
       

 05-07-2010
4.50
Rear spar and rib rivet job.
Details
       

 05-06-2010
2.50
Rear spar primed.
Details
       

 05-04-2010
2.25
Upper spar caps
Details
       

 05-04-2010
3.50
Rear spar trial fitting.
Details
     

 05-04-2010
2.50
Countersink
Details
       

 04-24-2010
3.50
Hinge rebuild and prime job.
Details
     

 03-31-2010
3.50
Checking fit of hinges for Verticle Stabilator
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.