KitLog pro

Powered By Kitlog Pro v2.0

Bearhawk N99DY
Work Logs Found: 52
Category Work Time: 315 Hours
 Date
Hours
Work Log Summary

Details

 12-02-2007
4.00
Rear left window
Details
     

 12-02-2007
16.00
fuel valve and lines
Details
       

 11-10-2007
16.00
Rudder Trim System
Details
       

 11-03-2007
6.00
Gascolator
Details
       

 10-06-2007
8.00
Parking brake valve
Details
     

 04-26-2007
8.00
Redo of electric trim servo.
Details
       

 04-06-2007
16.00
elevator balance weights
Details
       

 03-25-2007
8.00
more fuel lines
Details
       

 03-24-2007
30.00
fuel lines
Details
       

 02-13-2007
10.00
Pilot and C/P doors.
Details
       

 01-06-2007
8.00
Rear pax door
Details
       

 12-09-2006
2.00
Installed prop gov
Details
       

 11-04-2006
2.00
Oil cooler mounting
Details
       

 10-14-2006
8.00
Mounted the 540 and the exhaust
Details
       

 09-23-2006
8.00
Fuel Valve/Aux Pump Switches
Details
       

 09-10-2006
10.00
Cargo Door
Details
       

 08-23-2006
6.00
Tailwheel and spring
Details
       

 08-21-2006
10.00
Stringers
Details
       

 08-19-2006
8.00
left boot cowl extension
Details
       

 08-19-2006
1.00
Instrument panel fit and clecoed in place
       

 08-19-2006
0.00
1st draft of panel
Details
     

 08-18-2006
8.00
right side extension
Details
       

 08-15-2006
6.00
fit boot cowl side extendions
Details
       

 08-10-2006
0.00
Went to Vegas and Hoover Dam
Details
       

 08-07-2006
4.00
Removable top cover on instrument panel
Details
       

 08-05-2006
8.00
boot cowl fitted
Details
       

 08-04-2006
6.00
Angle for instrument panel
Details
       

 08-01-2006
6.00
working on the boot cowl and instrument panel
Details
       

 07-31-2006
4.00
Mounted Andair Fuel Valve
Details
       

 07-28-2006
6.00
Firewall Tunnel
Details
       

 07-21-2006
2.00
Aft cabin bulkhead
Details
     

 06-05-2006
2.00
Oil cooler and mount
Details
       

 06-01-2006
0.00
Recieved exhaust system from Vetterman
     

 05-22-2006
2.00
rear avionics shelf
     

 05-05-2006
4.00
floorboard in cargo area
     

 04-28-2006
4.00
floorboard under rear seat
     

 04-17-2006
4.00
floorboard under front seats
     

 04-04-2006
6.00
Floorboard under control sticks
     

 04-01-2006
6.00
Forward floor board
     

 03-13-2006
0.00
Took a break from BH to build bathroom in hangar!

 03-11-2006
5.00
started installing elevator trim
Details

 03-06-2006
4.00
installed control sticks
       

 03-04-2006
3.00
installed rudder petals and brake cylinders
       

 03-01-2006
4.00
Installed main landing gear to fuselage
     

 02-28-2006
3.00
Install tires on wheels
     

 02-28-2006
6.00
Drill and install brakes on gear legs
     

 02-27-2006
4.00
drill and tap oil fill hole, assemble struts
     

 02-25-2006
6.00
elevator control cables and bellcrank
       

 02-24-2006
4.00
Installed elevators and rudder
     

 02-23-2006
4.00
installed horizonal stab
     

 02-22-2006
6.00
Unpack and inventory
Details
     

 02-21-2006
3.00
Delivery of the kit
       










Copyright © 2001-2024 Matronics. All Rights Reserved.