KitLog pro

Powered By Kitlog Pro v2.0

Mark s Airplane Factory
Work Logs Found: 21
Category Work Time: 99 Hours
 Date
Hours
Work Log Summary

Details

 03-15-2012
3.00
Fuel Filler Neck Block Off
Details
       

 11-29-2011
3.00
Firewall Pass Thrus
Details
     

 11-28-2011
3.00
Engine Wiring
Details

 11-27-2011
4.00
Oil Separator Return Line
Details
       

 11-24-2011
2.00
Install Oil Cooler Lines
Details
     

 11-19-2011
4.00
Fabricate Oil Cooler Lines
Details
       

 05-16-2011
6.00
More Baffle Assembly
Details
     

 05-15-2011
6.00
Engine baffles
Details
       

 04-10-2011
2.00
Mount Oil Separator
Details
     

 04-07-2011
3.00
Engine Electronics
Details
       

 03-21-2011
2.00
Engine Electronics
Details
     

 03-19-2011
6.00
Install Throttle and Mixture Cables
Details
     

 12-07-2010
6.00
Engine Compression Change
Details
     

 05-07-2010
4.00
Build Up of AeroInjector
Details
       

 05-02-2010
6.00
Coating the Exhaust and Intake
Details
       

 05-01-2010
5.00
Engine Mounted
Details
       

 02-15-2010
8.00
Engine Assembly
Details
       

 02-14-2010
8.00
Engine Assembly
Details
       

 02-13-2010
10.00
Engine assembly
Details
       

 02-12-2010
4.00
Engine Arrival
Details
       

 02-12-2010
4.00
Camshaft, case prep
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.