KitLog pro

Powered By Kitlog Pro v2.0

GEORGE'S WEB SITE
Work Logs Found: 73
Category Work Time: 747 Hours
 Date
Hours
Work Log Summary

Details

 07-26-2008
26.00
Finally got labels installed for breakers & switch
Details
       

 05-14-2008
24.00
CAD drawing of aluminum panel inserts
Details

 05-06-2008
7.00
assemble and match drill first flap

 01-19-2007
8.00
installing floor panels a
     

 01-16-2007
5.00
floor pans
     

 01-15-2007
6.00
baggage door
     

 12-08-2006
6.00
reviting four fuse skins
       

 12-02-2006
8.00
assembling fuselage
       

 11-18-2006
8.00
machine countersink and dimple fuse parts

 11-11-2006
10.00
match drilling fuse parts

 10-28-2006
10.00
installing insulation in fuse floor

 10-21-2006
7.00
dimpling and priming fuselage skins & parts

 10-14-2006
8.00
bending longerons and misc.

 10-07-2006
10.00
installing bottom skin on fuselage
Details
     

 09-30-2006
10.00
firewall parts assembly

 09-23-2006
10.00
assembling fuselage

 09-14-2006
4.00
bringing crate home
       

 06-24-2006
10.00
reviting wing bottom skin -small piece

 06-17-2006
8.00
Installing pitot tube sleeve in wing bottom

 06-10-2006
8.00
reviting on small bottom wing skin

 06-03-2006
6.00
Installing the aileron servo
     

 05-28-2006
6.00
finish riveting top & bottom skin and prosealed tr
       

 05-24-2006
4.00
dimple and paint flaps parts

 05-21-2006
7.00
match drill and dimple first flap

 05-07-2006
5.00
assemble flap and dimple, countersink

 04-23-2006
4.00
assembly, revit and final adjust on wing

 04-17-2006
2.00
assemble and mount on wing & adjust

 04-15-2006
8.00
assemble aileron and mount on wing

 04-10-2006
3.00
final assembly and proseal trailing edge

 04-09-2006
6.00
dissemble, dimple, Countersink, and prime

 04-08-2006
6.00
assemble and match drill second aileron

 04-05-2006
3.00
assemble aileron and proseal trailing edge

 04-02-2006
5.00
dimple and prime inside all parts

 04-01-2006
7.00
assemble, match drill, and dissamble

 03-19-2006
3.00
assemble, match drill &proseal tank ribs, & rivet

 03-18-2006
4.00
right gas tank sealing and riveting

 03-12-2006
6.00
testing for leaks with balloon

 02-11-2006
8.00
assemble and match drill second tank

 02-07-2006
5.00
prosealing left fuel tank
     

 02-06-2006
2.00
inboard fuel tank -dimpleing left

 02-05-2006
6.00
indoard fuel tank left

 02-04-2006
4.00
inboard leading edge=fuel tank match drill
     

 02-03-2006
4.00
inboard leading edge =fuel tank

 01-31-2006
6.00
Outboard eading edge right wing- section 17
     

 01-29-2006
4.00
revited skin a ribs to spar

 01-28-2006
4.00
worked on trailing edge- visited rv-10 in Conroe
       

 01-27-2006
5.00
working on right wing spar & ribs
     

 01-24-2006
6.00
no pro seal- so started right wing spar

 01-22-2006
4.00
left wing make ready

 01-21-2006
5.00
dimpleing left fuel tank

 01-20-2006
6.00
cut all the tank baffles and pieces

 01-15-2006
6.00
start right wing- spar work

 01-15-2006
6.00
assembling left fuel tank

 01-14-2006
4.00
build a cradle for wings
     

 01-13-2006
6.00
getting fuel tank ready to close

 01-08-2006
6.00
installing ribs and match drilling leading edge fu

 01-07-2006
7.00
attaching leading edge to main spa

 01-06-2006
7.00
reviting leading edge skin of wing

 01-04-2006
7.00
getting ribs and skin ready to rivet & prime

 01-02-2006
4.00
revit top skins behind main spar

 12-30-2005
5.00
riveting the top skin on ribs and spar

 12-28-2005
5.00
dimpleing and priming top skins

 12-26-2005
6.00
adding the rear spar to the ribs

 12-24-2005
7.00
getting ribs ready to rivet

 12-21-2005
6.00
working on ribs additions

 12-20-2005
6.00
installing rivet nuts and extension

 11-26-2005
40.00
asseble all sections/servo/bell cramk

 11-15-2005
80.00
build tail cone bulkheads and skins
       

 09-30-2005
60.00
assemble elevators & trim tabs
       

 09-19-2005
60.00
horizontal stabilizer
       

 09-09-2005
20.00
assemble rudder
     

 09-02-2005
40.00
build vertical stabilizer
Details
       

 08-28-2005
12.00
unpacking everything
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.