KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
Work Logs Found: 114
Category Work Time: 224 Hours
 Date
Hours
Work Log Summary

Details

 02-23-2012
2.00
Temp Floor / Cowl Work
Details
       

 11-30-2011
3.30
Paint Wingtips / 2nd Engine Start / Bungee / Paint
Details
       

 10-11-2011
1.30
Trial Fit of Panel / Comm Check
Details
       

 10-03-2011
2.90
Coax / Elevator Rod / Bushings
Details
       

 09-29-2011
2.70
Install Control Frame / Mount Propellor
Details
       

 09-27-2011
2.50
Elevator Control Linkage / Trim Lever-Cable
Details
       

 09-26-2011
3.70
Spar Tunnel Riveting / Control Rod prep
Details

 04-11-2011
1.00
Fitting Left Cowl
Details
       

 01-10-2011
1.20
Timing Check & Throttle Cable Checkout
Details
       

 10-17-2010
3.50
Wing Tip / Panel Labels / AHRS Mount
Details
       

 08-18-2010
2.00
Finish Fuselage Vents / Swap Brake Drums
Details
       

 08-17-2010
0.60
Up-drill / deburr vents
Details

 08-16-2010
1.20
Cut Fuselage Vent Holes
Details
     

 08-13-2010
1.50
Make Door Template / Locate vent frame
Details
       

 08-12-2010
1.70
Prep Van's RV-10 Vents
Details
       

 05-23-2010
3.00
W/Shield Bow, Motor Mount, Tailwheel, Tank Stops
Details

 05-21-2010
2.20
Upper Firewall Install / Fuel Tank Vent Install
Details
       

 05-20-2010
1.20
Fwd Fuel Tank Strap Install / Vent Hole in Upper F
Details
       

 05-15-2010
2.50
Install Fuel Tank
Details
     

 05-14-2010
4.00
Glareshield / Fuel Tank Final Adjustments
Details

 05-13-2010
0.80
Adjust Rudder Pedal
Details
     

 05-06-2010
0.80
Add Felt to Tank & Tank Straps
Details

 05-05-2010
0.30
Re-Flared Fuel Line
Details

 05-02-2010
2.70
Gas Tank Prep for Installation / Tank Straps
Details
       

 05-01-2010
4.00
Gascolator Support / Firewall Prep
Details
       

 02-17-2010
0.90
clean up / prep
Details
     

 02-13-2010
3.00
glareshield / fuel tank / fuel line
Details
       

 01-02-2010
2.60
Gascolator
Details
     

 12-30-2009
1.30
Gas Tank Cleanup
Details
       

 12-22-2009
1.50
Brake Block / Control Idler / Panel CrossTie
Details

 12-20-2009
2.30
Finished SNX-C05 - Controls Assy
Details
     

 12-15-2009
1.10
Control Stick Assy / Rudder & Tail checkout
Details

 12-13-2009
3.20
Finish Rudder Pedals & Flap Handle
Details
       

 12-12-2009
2.80
Rudder Pedals
Details
       

 12-08-2009
1.40
Rudder Pedal Phenolic Blocks
Details
       

 11-21-2009
6.50
Finished SNX-F08
Details
       

 11-19-2009
1.10
Seat Back Hinge Placement
Details
     

 11-15-2009
1.00
Flip Fuse / Install Seat
Details
       

 11-12-2009
2.00
Add Piano Hinge to Seat Sling Panel
Details
     

 11-09-2009
0.80
Seat Pan Hinge Locating
Details

 11-08-2009
2.40
Seat Pan Fabrication / Bending
Details
       

 11-07-2009
2.50
Seat Pan Markup / Rough Cuts
Details
     

 11-05-2009
0.70
Spar Carry Thru / Misc
Details

 11-01-2009
2.40
Rear Spar Carry-Thru
Details
       

 10-11-2009
3.00
Rear Spar Channel Details
Details
     

 10-07-2009
0.70
Fabricate SNX-F08-12 Trim Cable Angle
Details

 10-05-2009
0.60
Cut Hinge Sections for Seat
Details

 10-03-2009
4.90
Finish Aft Lower Cabin Details
Details
       

 10-02-2009
5.80
Finalizing Location of Aft Lower Cabin Sub Assys
Details
     

 09-30-2009
1.00
Aft Cabin Center Supports
Details
       

 09-29-2009
0.80
Aft Cabin Details
Details
     

 09-28-2009
1.60
Seat Belt Attach Assy Installation
Details
       

 09-26-2009
3.50
Aft Lower Cabin Details
Details
       

 09-24-2009
0.50
Drill Angle Hinge / Finish SNX-F10
Details

 09-23-2009
1.20
SubAssembly Construction
Details
     

 09-22-2009
0.70
Assemble Elevator Idler Assy
Details
     

 09-20-2009
2.70
Detail parts for aft portion of fwd fuse
Details
     

 09-19-2009
1.60
Fwd Fuse Detail Parts
Details
     

 09-18-2009
0.80
More under seat parts fab
Details

 09-17-2009
1.50
Lowered Seat Parts Detail
Details
       

 09-14-2009
1.00
Initial Parts Collection / Cutting Stock
Details

 09-12-2009
7.00
Finished SNX-F11 / Fwd Part of Fwd Fuse
Details
       

 09-10-2009
1.00
Finish Deburr / Reassembly
Details

 09-09-2009
1.10
Deburr Lwr Fwd Fuse Skin, Right Fwd Fuse Panel
Details

 09-08-2009
4.10
Major Assy Up-Drill / Deburr
Details

 09-01-2009
0.80
Misc Corrections / Deburr / Countersink
Details

 08-31-2009
1.30
Up-Drill Fuselage Splice Plates
Details

 08-29-2009
4.30
General UpDrill / Deburr Fwd Fuselage
Details

 08-26-2009
1.00
Updrill & Deburr
Details

 08-25-2009
1.00
Up-Drill Firewall / Install Gussets
Details

 08-24-2009
0.90
Locate / Pilot Drill Floor Stiffener & Gusset
Details
       

 08-22-2009
4.00
Continued Fwd Fuse Subassemblies
Details
       

 08-21-2009
2.50
Lower Firewall Install
Details
       

 08-16-2009
3.50
Drill Splice Plates / Fit Tunnel Zee
Details
       

 08-15-2009
2.20
Fwd Fuse Misc Details
Details

 08-13-2009
0.00
Misc Study of Fwd Fuse Mate
Details

 08-12-2009
1.00
Located / Pilot Drilled Lower Fwd Skin
Details
     

 08-10-2009
2.00
Initial Fuselage Mate
Details
       

 08-09-2009
3.80
Completed SNX-F16 / Tunnel Zee
Details
       

 08-08-2009
2.50
Tunnel Zee / Clip Fabrication
Details
       

 08-07-2009
0.50
Align Aft Tunnel Zee
Details
     

 08-05-2009
2.00
Aft Tunnel Zee Details
Details

 08-04-2009
1.30
Aft Tunnel Zee
Details

 08-03-2009
0.80
Finished SNX-F17
Details

 08-02-2009
2.40
Detail Parts for Fwd Fuse Assy
Details
       

 07-20-2009
1.20
Rivet Fuel Filler to Upper Firewall
Details
       

 07-19-2009
3.60
Continued Work on Upper Firewall SubAssy
Details
       

 07-18-2009
2.30
Locate Upper Firewall Southco Retainers, Updrill H
Details
     

 07-17-2009
1.10
PIlot Drill W/S Strap to Upper Firewall Former
Details
       

 07-15-2009
0.60
Form strap to firewall former
Details

 07-13-2009
0.80
Adjust Flutes on Upper Formed Firewall
Details
     

 07-12-2009
2.30
Upper Firewall Detail Parts
Details
     

 07-11-2009
1.20
Completed SNX-F12
Details

 07-10-2009
1.00
Rivet Left Fwd Fuselage
Details
     

 07-09-2009
1.30
Complete Debur Left Fwd Fuse
Details

 07-08-2009
1.30
Deburring Left Fwd Fuselage
Details

 07-07-2009
1.50
Up-Drilled Left Fwd Fuselage
Details

 07-06-2009
0.50
Add Left Fwd Fuse Doubler & Firewall Attach Angles
Details

 06-26-2009
6.00
Riveted Right Side, Located Left Side
Details
       

 06-25-2009
0.80
Build-Up Right Fwd Fuse Skin for Riveting
Details

 06-24-2009
0.70
Completed Prep for Riveting Right Fwd Fuse Skin
Details

 06-23-2009
1.00
Deburr Right Fwd Fuse Skin
Details

 06-22-2009
1.00
Finished Locating Parts - Right Fwd Fuse
Details
     

 06-21-2009
4.20
Continued Continuation of Right Fwd Fuse Parts Bui
Details
       

 06-20-2009
1.20
Continued addition of R fwd fuse parts
Details
       

 06-19-2009
1.30
Parts Placement - Right Fwd Fuselage
Details
       

 06-18-2009
1.30
Start of Right Fwd Fuse BuildUp
Details
     

 06-15-2009
1.00
Add Longeron Doubler Plates
Details
       

 06-14-2009
2.80
Latch Plate Fabrication and Install
Details
     

 06-13-2009
4.00
Finish Up SNX-F14
Details
       

 06-12-2009
1.80
Fwd Fuse Parts
Details
       

 06-11-2009
1.20
Complete SNX-F15
Details
     

 06-10-2009
0.80
Flap Blocks
Details

 06-08-2009
1.50
First Fwd Fuse Parts
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.