KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
Work Logs Found: 119
Category Work Time: 249 Hours
 Date
Hours
Work Log Summary

Details

 06-03-2012
2.30
Final Control Surfaces Rigging
Details

 05-24-2012
1.50
Rigged Control Surfaces; Mod'd seat pan
Details
     

 05-14-2012
2.30
Control Surfaces
Details

 11-29-2011
1.50
Painted Wingtips / Cleanup / Misc
Details

 11-28-2011
1.80
Finish Wing Wiring / Trim Doubler
Details
       

 11-24-2011
1.30
Wiring the wings
Details

 09-23-2011
2.00
Spar Tunnel Riveting
Details
       

 09-19-2011
3.50
More riveting; brake cable; seat belts
Details
     

 09-17-2011
3.00
Frustrating, Wasted Day
Details
     

 09-15-2011
2.70
Aft Spart Tunnel; Flap Control Rod; Brake Cable
Details
       

 09-12-2011
0.80
Rivet Swap / Misc Cleanup
Details
       

 09-10-2011
6.00
Re-Rigging the Wings
Details
       

 08-28-2011
0.00
Part II - Re-drill Wing Attach Blocks
Details
       

 08-28-2011
2.30
Part I - Re-drill Wing Attach Blocks
Details
       

 08-26-2011
1.80
Wing Doubler Trim / Gear Bolt / Exhaust Hangar
Details

 08-17-2011
3.00
Trial fit strobe / nav / position light pods
Details
       

 07-08-2011
1.40
Complete Refit of Aft Wing Attach Angles
Details

 07-07-2011
1.70
Finish-up of aft wing attach angles
Details
       

 06-28-2011
1.80
Attach Angle Re-Fit
Details

 06-11-2011
3.50
Aft Spar Carrythrough Riveting & Cowl Fasteners
Details
       

 06-04-2011
7.30
Wing Rigging
Details
       

 06-04-2011
1.80
Marking wing doubler
Details
       

 06-01-2011
0.30
Cleaning Wings fo Rigging
Details

 05-31-2011
1.20
Pre-Wing Rigging
Details
       

 10-16-2010
3.00
Misc & Install Wing Tip
Details
     

 03-01-2009
1.40
Landing Light Lens Install
Details
       

 02-02-2009
1.00
Prep Left Flap
Details
     

 02-01-2009
0.90
Left Flap Details
Details
     

 01-31-2009
2.40
FINISHED Left Wing Box
Details
       

 01-29-2009
1.50
Install Light Kit Lens Brackets
Details
       

 01-28-2009
1.20
Light Kit Hole in Wing
Details
       

 01-25-2009
4.10
Landing Light Bracket / Reposition LE Skin
Details
       

 01-24-2009
3.90
Left Leading Edge Skin Prep for Riveting
Details
       

 01-22-2009
1.20
Left Wing LE Rib Prep for Riveting
Details

 01-21-2009
1.60
Riveted Left Wing Lower Aft Skin
Details
       

 01-19-2009
2.20
Aileron Control Rod Install / Deburr Aft Skin
Details
       

 01-18-2009
1.20
Left Wing Deburr for Lower Aft Skin
Details

 01-17-2009
2.20
Prep work for Left Lower Aft Skin
Details
       

 01-15-2009
0.80
Left Upper Aft Skin Riveted
Details
     

 01-14-2009
1.00
Completed Deburr of Left Upper Aft Skin
Details
     

 01-12-2009
2.10
Upper Aft Skin Debur & Re-Rivet #5 Rib
Details

 01-11-2009
1.00
Deburr Upper Aft Wing Skin (Left)
Details
     

 01-10-2009
3.80
Remainder of Left Wing Box Prep details
Details
       

 01-09-2009
1.20
Misc Left Wing Deburr Prep
Details
     

 01-08-2009
1.30
Left Wing Hinges & Spar Up-drill
Details
       

 01-07-2009
1.30
Bottom side of Left Wing Leading Edge Cleco
Details
       

 01-06-2009
2.40
Left Wing LE Skin Fitment
Details
       

 01-04-2009
2.40
Lower Aft Skin Fitting
Details

 01-02-2009
4.40
Fitting Left Lower Aft Skin
Details
       

 01-01-2009
4.90
Left Wing Aft Upper Skin Fitting
Details
       

 12-30-2008
4.10
Left Wing Skeleton Completed
Details
       

 12-29-2008
2.80
Progress toward left spar / rib assembly
Details
     

 12-28-2008
0.00
Wing Support Jig
Details
       

 12-27-2008
2.20
Left Wing Misc Deburr
Details

 12-26-2008
1.20
Left Root Rib Rivet & Up-Drilling Ribs
Details
       

 12-25-2008
0.60
Deburr Left Root Rib
Details

 12-24-2008
3.30
Left Wing Root Rib Placement
Details
       

 12-20-2008
4.50
Left Wing Rib Attachment
Details
     

 12-19-2008
0.50
Completed SNX-W21 (Left Aileron Bellcrank)
Details
     

 12-18-2008
1.40
Left Ailieron Bellcrank / Rib #9 Ready to Rivet
Details
       

 12-17-2008
1.10
Left Rib #9 Bellcrank subassembly
Details
     

 12-16-2008
1.00
Left Aileron Bellcrank Details
Details

 12-14-2008
3.30
Left Root Rib Details / Left Fwd Rib Rework
Details
       

 12-11-2008
0.50
Deburred Reworked Fwd Ribs 1 & 4
Details

 12-10-2008
0.70
Left Wing Rib 1 & 4 Rework
Details
     

 12-09-2008
1.00
Left Wing Fwd Rib Rework
Details
     

 12-07-2008
2.00
Completed Right Wing Box (mostly)
Details
       

 12-06-2008
3.80
Right Wing Leading Edge Rivet
Details
       

 12-01-2008
0.20
Right Root Rib Correction
Details
       

 11-30-2008
3.30
Right Wing Lower Aft Skin Riveted
Details
       

 11-29-2008
4.60
Prep Right Wing Lower Aft Skin for Riveting
Details
       

 11-17-2008
2.30
Riveting Right Wing Upper Aft Skin
Details
       

 11-16-2008
2.60
More Deburring Right Wing
Details

 11-14-2008
2.70
Right Wing Skin Deburr
Details
     

 11-10-2008
1.10
Right Wing Aileron Hinge Initial Fit
Details
       

 11-09-2008
2.80
Right LE Skin Dimple / Deburr / Aft Spar Drill
Details

 11-08-2008
0.80
Leading Edge Dimple Prep
Details
       

 11-07-2008
1.10
Dimpled Rib Cleanup
Details

 11-06-2008
1.50
Misc Right Wing Closure Prep
Details
       

 11-04-2008
1.30
Position / Drill / Cleco Right Wing Flap Hinge
Details
     

 11-03-2008
1.20
Misc Right Wing Prep Detail
Details
       

 11-02-2008
3.30
Pitot / Static Fitting
Details
       

 10-31-2008
2.90
Updrilling and Dimpling Right LE Skin / Ribs
Details
       

 10-29-2008
1.40
Right Wing Doubler / Updrilling
Details

 10-28-2008
1.30
Right Wing Detail Prep Work
Details

 10-27-2008
1.10
Up-Drill Right Wing Skins
Details

 10-23-2008
1.00
Right Leading Edge Pilot Drilling
Details
       

 10-22-2008
1.30
Right Leading Edge Skin
Details

 10-19-2008
3.20
Right Wing Leading Edge Trial Fit
Details
       

 10-18-2008
2.20
Right Wing Lower Aft Skin Fitting
Details
     

 10-17-2008
3.90
Right Wing Bottom Aft Skin Fitting
Details
       

 10-15-2008
1.40
Drill / Cleco Right Upper Aft Skin
Details
       

 10-13-2008
2.30
Right Wing Upper Aft Skin Fitment
Details
     

 10-11-2008
4.10
Right Wing Skeleton Completed
Details
       

 10-09-2008
1.00
SNX-W21-09 Clip Details
Details

 10-07-2008
1.00
Misc Aileron Bellcrank Details
Details
       

 10-04-2008
4.20
Right Wing Lower Aft Skin Fitting
Details
     

 10-01-2008
1.70
Rib 9 Aileron Bellcrank (Right Wing)
Details
       

 09-30-2008
1.60
Aileron Bellcrank Assemblies
Details
     

 09-29-2008
1.60
Completed Riveting R Wing Ribs
Details
     

 09-25-2008
1.20
Right Wing Rib Riveting
Details
     

 09-24-2008
1.20
Rib Debur (Right)
Details

 09-23-2008
1.10
Debur Ribs (Right Wing)
Details

 09-22-2008
0.80
Debur / Prep for R Wing Assy
Details

 09-21-2008
2.50
Root Rib Riveting & Deburr
Details
     

 09-20-2008
7.70
Root Rib & Aileron Bellcrank Parts
Details
       

 09-19-2008
1.40
Up-Drilled Wing Ribs
Details

 09-17-2008
1.10
Wing Box Assembly
Details
       

 09-15-2008
1.10
Position Center Spacers
Details
     

 09-14-2008
2.40
Rib Attach Detail Parts
Details
       

 09-14-2008
1.50
Complete SNX-W15 Page
Details
       

 09-14-2008
1.50
Added Pitot/Static Tubing Supports
Details
     

 09-11-2008
1.00
Completed Aft Ribs
Details
     

 09-10-2008
1.90
Aft Rib Prep / Cleanup
Details
     

 09-07-2008
4.20
Aft Rib Detail Work
Details

 09-06-2008
5.00
Completed Forward Ribs
Details
       

 09-03-2008
1.00
Forward Rib Trimming
Details
       

 09-02-2008
0.80
Rib Trimming Prep
Details

 09-01-2008
2.70
Rib Gusset
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.