KitLog pro

Powered By Kitlog Pro v2.0

Zenith CruZer & Sonex Logs
Work Logs Found: 83
Category Work Time: 148 Hours
 Date
Hours
Work Log Summary

Details

 10-14-2011
1.50
Crank Engine / Seat Belts
Details

 08-15-2011
0.60
Install Aft Exhaust Support
Details
       

 08-14-2011
3.20
Baffle tweak, Exhaust shield, exh springs
Details
       

 07-20-2011
1.80
Engine Baffle Work
Details

 07-18-2011
3.20
Engine Baffles
Details
       

 07-13-2011
2.80
Wing Attach Block, Wiring, Air Filter
Details
       

 02-27-2011
3.10
Finish FWF Wiring / Install Oil Breather Tube / Re
Details
       

 02-26-2011
4.20
Oil Breather Tube / Routing EGT/CHT
Details
       

 02-24-2011
1.30
Engine FWF Wiring
Details

 02-22-2011
0.60
Install Exhaust Flange Gaskets
Details

 02-21-2011
0.70
Engine wiring / crankcase vent
Details

 02-20-2011
1.50
Exhaust Pipe Trimming
Details
       

 02-19-2011
2.50
EGT Finish / Lower Plugs / Fuel Sensor
Details
     

 02-17-2011
1.40
EGT & R/F Baffle
Details
       

 02-16-2011
1.00
Running Upper Plug Wires
Details
       

 02-14-2011
1.00
Sensor wiring
Details

 02-13-2011
2.00
Harness Tidy Up
Details
       

 02-09-2011
1.00
Upper Mag Wiring / Battery Cable Fab
Details
       

 01-30-2011
2.00
More Engine Wiring
Details

 01-29-2011
3.50
Engine Wiring
Details
       

 01-27-2011
1.50
Wire Electronic Ignition Coils
Details
     

 01-26-2011
0.80
Electrical Work FWF
Details

 01-25-2011
1.30
Oil Cooler Installation Complete
Details
       

 01-23-2011
4.00
Oil cooler baffling
Details
       

 01-21-2011
2.50
Ground wires, oil cooler baffle, battery wires
Details
       

 01-20-2011
0.60
Fuel System & Carb Wrap-up
Details
       

 01-20-2011
0.60
Finish Firesleev-ing Fuel & Oil Lines
Details
       

 01-19-2011
0.70
Cut oil lines / cut firesleeve / dip firesleeve
Details

 01-17-2011
0.70
Firesleeve Dip & Oil Line Fittings
Details
       

 01-16-2011
1.20
Mixture Cable & Fuel Line
Details
     

 01-15-2011
1.50
misc engine
Details

 01-13-2011
1.00
Exhaust Trial / Trimming Case Boss
Details
       

 01-12-2011
1.00
Oil Cooler Baffle
Details

 01-09-2011
1.00
Intake & Carb fitting
Details
       

 01-09-2011
2.20
Completion of Aft Fence Baffle
Details
       

 01-07-2011
2.40
Aft Fence Baffle Trimming
Details
       

 01-04-2011
1.00
Fence Baffles & Exhaust Header
Details
     

 01-03-2011
1.00
Initial Checkout of Fence Baffles
Details
     

 01-01-2011
3.50
Intake Work / Carb Drilling
Details
       

 12-31-2010
2.50
Hanging the Engine
Details
       

 12-30-2010
2.50
Engine detail finish
Details
     

 12-27-2010
1.00
Install Secondary Ignition Trigger & Alt Stator
Details
     

 12-26-2010
2.90
Torque Gland Nut / SuperTin / Mags
Details
       

 12-09-2010
0.70
prop bushings / oil pump
Details
       

 12-08-2010
1.10
Oil Pump Checkout / Prop Bushings
Details
     

 12-04-2010
3.20
Pushrods
Details
     

 12-01-2010
1.20
Pushrod Length Calculation
Details

 11-23-2010
0.60
Set up right rocker assy
Details

 11-22-2010
0.70
Rocker Arm Alignment
Details
     

 11-21-2010
3.00
Install Left Head / Cover Plates / Oil Sump
Details
       

 11-20-2010
6.10
Mate Case / Install Cylinders / Install R Head
Details
       

 11-17-2010
0.60
Engine Mate Prep
Details
     

 11-14-2010
2.30
Crank / Cam Install / Set End-Play
Details
     

 11-12-2010
2.00
Rods / Cam Bearings / Studs
Details
       

 11-10-2010
1.10
Connecting Rods / Flywheel
Details
       

 11-07-2010
1.00
General Prep Work
Details

 11-05-2010
0.50
Finished Engine Paint
Details

 11-04-2010
0.70
Painted Case, Torqued Assy's
Details

 11-03-2010
1.10
Engine Case Masking
Details
     

 11-02-2010
0.80
Masking-off Engine Case for Painting
Details

 10-31-2010
2.00
Case Prep / Crankshaft Finish
Details

 10-30-2010
1.50
Prop Hub Installation
Details
     

 10-29-2010
2.30
Crankshaft preparation
Details

 10-03-2010
3.50
Engine Prep & Rework Battery Box
Details
     

 06-13-2010
4.00
Adding Nutplates / Paint Glareshield / Mod Instrum
Details
       

 04-29-2010
2.00
Gascolator Reinforcement, Part II
Details
     

 04-28-2010
1.10
Firewall / Gascolator Stiffening
Details
       

 03-21-2010
2.30
Tail / Rudder Stops / RDAC Mount
Details
       

 02-06-2010
2.80
Firewall Work
Details
       

 02-03-2010
1.50
Wiring / Gascolator / Tank
Details

 01-31-2010
2.30
Fuel Line / Air-Oil Separator
Details
       

 01-22-2010
1.00
Ground Buss / Thread Cleanup
Details

 01-20-2010
1.00
Finished Battery Box
Details
     

 01-17-2010
2.00
Battery Box, continued
Details
     

 01-16-2010
2.00
Battery Box Bend & Install
Details
       

 01-14-2010
1.30
Battery Box Layout / Cutting
Details
     

 01-10-2010
3.50
Wiring / Brake Cables / Battery Box
Details

 01-09-2010
3.00
Wiring / Throttle Quadrant
Details
     

 01-08-2010
1.00
Mount second coil
Details

 01-06-2010
1.10
Fix Gascolator / Add nutplates for 1 coil
Details

 01-05-2010
1.10
Mount Ignition Coils
Details
     

 01-04-2010
1.30
Drill Mount for Gascolator / Mount Volt Regulator
Details
       

 09-16-2009
1.00
Engine Arrival / Inventory
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.