Powered By Kitlog Pro v2.0
Bill's RV-10 Builder Page
RV-10
Fuselage
44 Logs Found
Date
Hours
Work Log Summary
Details
08-07-2010
8.0
Shoulder belt studs in cabin top
Details
02-21-2010
24.0
Windsheild
Details
12-09-2009
10.0
Rear Windows
Details
11-05-2009
4.0
Added 2 hardpoints for rear seat belt harness
Details
06-02-2008
15.0
Installed door pins and blocks and lock assembly
Details
05-30-2008
15.0
Assembled and installed door handles
05-11-2008
15.0
Doors - Continued
05-07-2008
15.0
Doors - continued
Details
05-05-2008
3.0
Started Doors
Details
05-03-2008
10.0
Rear Seat Backs
Details
04-01-2008
8.0
Fitting the Top - More Tools
Details
02-09-2008
50.0
Basic fitting of top to fuselage - tools
Details
12-22-2007
2.0
Fitting baggage corrugation
Details
12-22-2007
4.0
Baggage Door
12-21-2007
8.0
Prepping RH baggage cover & riveting bulkhead flan
Details
12-15-2007
4.0
Riveting Baggage area
Details
12-09-2007
20.0
Flap Control System
Details
12-01-2007
15.0
Installed Control Systems
Details
11-03-2007
6.0
Installed brake lines and master cylinder
Details
11-01-2007
6.0
Installed fuel filter, boost pump, and flo scan
Details
10-29-2007
8.0
Installed Matco Parking Brake
Details
10-26-2007
8.0
Assembled Rudder pedals
Details
10-13-2007
5.0
Finished Blind rivets front and rear floors
Details
10-11-2007
2.0
Riveted LH front seat floor
10-10-2007
6.0
Completed wiring of Strobe power supply
Details
09-15-2007
40.0
Battery Tray and Main Power Wiring
Details
08-15-2007
40.0
Electrical System Design
Details
08-02-2007
1.0
Baggage Area - door seals
Details
08-01-2007
3.0
Baggage area
Details
07-31-2007
6.0
Riveting tailcone to fuselage
Details
07-28-2007
6.0
Riveting Tailcone to Fuse
Details
07-27-2007
10.0
Riveting tailcone to Fuselage
Details
07-26-2007
4.0
Began riveting tailcone to fuselage
Details
07-18-2007
3.5
Tailcone attach
Details
07-16-2007
3.0
Match drilling and CSKing tailcone attach
Details
07-15-2007
9.0
Tailcone attach
Details
07-14-2007
2.5
Rivet misc nutplates, bagg door cutout,
07-14-2007
1.0
Fuselage Step installation
Details
07-12-2007
4.0
Inpected QB Fuse side skins and adjusted baggage d
Details
07-11-2007
2.5
QB Inspection Fwd Fuse ribs, Blkhds, and Bottom Sk
Details
07-10-2007
3.0
QB Fuselage Firewall work
Details
07-08-2007
1.5
QB inspection Mid Fuselage and bottom skins
Details
07-04-2007
7.0
Deconstructed QB Fuse and inspected work
Details
11-20-2006
0.0
QB Fuselage
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
All
ADS-B
Alexander Tech Cente
Avionics
Electrical
Engine
Final Assembly
Fuselage
Horizontal Tail
Interior
Maintenance & Post B
Miscellaneous
O2 Console
Painting A-Z
Panel
Tailcone
Tools
Undercarriage & Engi
Vertical Tail
Wheel pants
Wings
Workshop
Copyright © 2001-2013 Matronics. All Rights Reserved.