 03-27-2014
3.00
Final checks - then FIRST FLIGHT!
Details
       

 03-21-2014
3.50
More final prep work.
Details
       

 02-22-2014
5.00
Calibrating fuel tanks - stage 1
Details
       

 01-24-2014
1.00
Elevator stop-block
Details
       

 01-19-2014
2.00
More finishing touches & checking mag gap
Details
       

 01-04-2014
3.00
2nd taxi tests
Details
     

 01-01-2014
6.00
Engine run & first taxi tests
Details

 12-30-2013
4.00
Carbi exploring & Dynon EMS Mapping
Details
       

 12-28-2013
6.00
Engineer's inspection & engine start-up
Details
       

 12-27-2013
7.00
Reweighing & more flap work
Details
     

 12-26-2013
8.50
Wing root tape and wiring
Details
       

 12-21-2013
5.00
Weight and balance
Details
       

 12-20-2013
4.00
Preparing for weight and balance
Details
       

 10-28-2013
4.00
More general finishing work
Details
       

 10-19-2013
4.00
More finishing touches
Details
       

 10-18-2013
3.00
Flushing fuel tanks & battery charger
Details
       

 10-01-2013
4.00
Pre-inspection for certification
Details

 09-28-2013
5.00
Seat belts and electrics
Details
       

 09-27-2013
2.00
More finishing work ...
Details
       

 07-28-2013
5.00
Finishing tasks
Details
       

 07-27-2013
2.00
Tapping out and fitting wing tank drains.
Details
       

 07-26-2013
3.00
Finishing tasks
Details
       

 06-23-2013
3.00

Details
       

 05-19-2013
1.50
Cutting the seatbelt slots in the cockpit side lin
Details
       

 05-03-2013
7.00
Rigging day ...
Details
       

 04-02-2013
8.00
General work & wiring work
Details
       

 12-15-2012
1.00
Finishing wing skin repair
Details
       

 11-18-2012
2.00
Replacing the gear leg retaining bolts.
Details
       

 11-10-2012
0.50
Changing the linkage points on the elevator tube.
Details
       

 10-27-2012
4.00
Moving from the shared hangar.
Details
       

 10-14-2012
2.00
Making extra bolt spacers for the spar box.
Details
       

 09-30-2012
7.00
Control sticks & evevator trim electrics.
Details
     

 09-29-2012
5.00
Wing AOA bolts & electrics
Details
       

 09-15-2012
4.00
Removing the master relay - general elec work
Details

 07-21-2012
2.00
Moving the wings etc to Ed's hangar

 07-07-2012
5.00
The big move to the hangar....
Details
       

 07-06-2012
2.00
Last night in the garage ...!!
Details
       

 05-13-2012
3.00
Making and installing the flap position indicator.
Details
       

 05-12-2012
7.00
Finishing sensor cables & fitting flap position in
Details
       

 05-10-2012
3.50
Locating cables & holding cables at actuating arms
Details
       

 05-09-2012
1.50
Mounting bars to hold cables in position
Details
     

 04-18-2012
2.50
Centre console & flap position indicator
Details
       

 03-24-2012
1.50
Making mounting nuts for cable glands through the
Details
       

 03-17-2012
3.50
Wiring the CHT and EGT cables for the Dynon.
Details
       

 03-10-2012
2.00
Painting the face plates for the dash and consoles
Details
     

 03-05-2012
3.00
Fuel valve & cutting holes through firewall.
Details
       

 03-02-2012
4.00
Making up cover plates for throttle quadrant & fue
Details
       

 02-19-2012
2.50
Re-bleeding brake lines.
Details
       

 02-18-2012
1.50
Made "P" clamp to hold the fuel pressure sender.
Details
       

 02-17-2012
3.00
Wiring & fitting headset sockets.
Details
       

 02-11-2012
2.00
Priming the brake system.
Details
       

 02-04-2012
2.00
Cables & brake lines
Details
       

 01-28-2012
1.50
Making cardboard templates for the console cover p
Details
       

 01-27-2012
5.00
More work on panel.
Details
       

 01-26-2012
2.00
Fitting accessory socket.
Details
       

 01-25-2012
3.00
Fitting nut-plates to secure the panel.
Details
       

 01-24-2012
1.50
Changing to longer screws
Details
       

 01-11-2012
1.00
Panel work
Details
       

 10-29-2011
3.00
Rear of fuselage finished and wings moved to hanga
Details
       

 10-23-2011
3.50
Making mounting frames for the dynon remote units.
Details
       

 10-22-2011
2.50
Fitting the radio antenna and fixing all cables in
Details
       

 10-21-2011
3.00
Locating sensors and antenna.
Details
       

 10-16-2011
3.00
Locating antenna locations & prep
Details
       

 10-15-2011
3.00
Control cables and brake lines.
Details
       

 09-10-2011
4.00
Exhaust & Brake Lines
Details
       

 09-04-2011
6.00
More cable and firewall work.
Details
       

 09-03-2011
4.00
Fitting cables.....
Details
       

 09-02-2011
3.00
Panel Design
Details
       

 07-04-2011
1.00
Making up metal connector tubes for the fuel valve
Details
       

 07-03-2011
2.00
Final prep of firewall
Details
       

 07-02-2011
3.00
Flap tube and motor
Details
       

 06-27-2011
4.50
Rudder cable final fit.
Details
       

 06-24-2011
1.00
Fitting the elevator trim cable
Details
       

 06-05-2011
5.00
Getting ready to refit the elevators and controls.
Details
       

 05-27-2011
2.00
Getting the plane back - and back to work!
Details
       

 03-19-2011
2.00
Centre console - final prep for upholsterer.
Details
       

 03-15-2011
2.50
Wings & flaps to the paint shop.
Details
       

 03-09-2011
0.50
Finalising the paint design.
Details
       

 03-02-2011
1.00
Fuse to the paint shop at last!
Details
       

 03-01-2011
10.00
Sanding back undercoat.
Details
       

 01-22-2011
2.00
Last pre-painting works ..........
Details
       

 01-20-2011
1.50
Console frame completion.
Details
       

 01-19-2011
3.00
Centre & Fuel console
Details
       

 12-24-2010
4.00
General stuff
Details
       

 12-23-2010
2.50
Brake line mod - keeping the plastic tube away fro
Details
       

 12-22-2010
3.00
Centre console & fuel console
Details
       

 11-26-2010
2.50
Finishing the baggage area
Details
       

 11-13-2010
9.50
Lots of general work - oil cooler, glare shield &
Details
       

 11-05-2010
4.00
Using expanding foam to fill under the alloy top o
Details
       

 10-24-2010
1.50
Glare shield work
Details
       

 10-23-2010
4.00
Glare shield work and general stuff .....
Details
       

 10-22-2010
1.00
Started forming the glare shield on the English Wh
Details
       

 10-20-2010
1.50
Cutting the alloy for the glare shield frame
Details
       

 10-16-2010
6.00
General work plus template making
Details
       

 10-15-2010
2.00
Console mock-ups
Details
       

 10-14-2010
1.00
Glare Shield - bending glass sheet, or not .......
Details
     

 10-13-2010
2.00
More glare shield work
Details
       

 10-09-2010
7.00
Making a glare shield extension for the dash.
Details
       

 08-16-2010
2.00
Taping bushes and bearings - assembling parts fpr
Details
       

 08-15-2010
3.00
Fitting nose leg fairing.
Details
       

 08-14-2010
6.00
Final trim and fit of main gear wheel pants.
Details
       

 08-13-2010
4.00
Getting the wings and control surfaces ready for p
Details
       

 07-17-2010
7.50
Fitting main gear wheel pants
Details
       

 07-16-2010
6.00
More fuselage sanding - main gear pant prep.
Details
     

 06-19-2010
6.00
Manufacture & fit of front wheel pant.
Details
       

 06-07-2010
5.00
Main gear alignment & bolting.
Details
       

 05-10-2010
2.00
Flipping the plane and fitting the main gear.
Details
       

 05-08-2010
7.00
Centre console work, seat back brace and canopy dr
Details
       

 05-06-2010
2.00
More work on the centre console
Details
       

 04-19-2010
12.00
The start of work on the seat & console ..........
Details
       

 04-14-2010
1.00
Stand for new tool chest
Details
       

 01-02-2010
0.50
Drilling plates & preloading bushes
Details
       

 12-28-2009
1.30
Moving wings from livingroom to garage (hanger)
Details
       

 07-18-2009
5.00
Elevators, axles & canopy
Details
       

 07-14-2009
1.00
Removing toe brake bars from right side.
Details
       

 07-12-2009
4.00
Elevator bell crank
Details
       

 05-31-2009
2.00
Finishing rudder assemblies and cables
Details
       

 05-30-2009
4.00
Fitting rudder cables
Details
       

 05-23-2009
5.00
Finished rudder pulleys - cutting out for rudder c
Details
       

 05-16-2009
2.00
Fabricating and assembling the rudder cable pulley
Details
       

 05-15-2009
5.00
Fabricating and installing rudder assemblies
Details
       

 05-14-2009
2.00
More work on the pedal bar assembly.
Details
       

 03-02-2009
7.00
Made the rudder pedal flute tubes and the the rudd
Details
       

 02-21-2009
0.00
Building a new storage rack for wings etc
Details
       

 02-06-2009
5.00
Firewall & rudder work
Details
       

 01-24-2009
4.00
Firewall part 1
Details
       

 01-02-2009
0.50
Drilling plates and pre-loading bushes.
Details
       

 08-14-2008
5.00
Inventory
Details

 08-13-2008
1.00
Sorting & storing fastenings
Details
       

 08-12-2008
0.50
Loading into garage
Details
       

 08-11-2008
3.00
Kit arrival & receiving