KitLog pro

Powered By Kitlog Pro v2.0

RV10 I-CAVS
Work Logs Found: 184
Category Work Time: 422 Hours
 Date
Hours
Work Log Summary

Details

 04-27-2020
3.00
TO DO PRIMING CHECKLIST
Details

 04-27-2020
2.00
TO DO CHECK LUCIO stiffener F 1047 X fitting
Details

 04-27-2020
2.00
TAILCONE matchdrill longerons
Details

 04-27-2020
1.00
TAILCONE CHECK LUCIO cover plate dimples and final
Details

 04-27-2020
1.00
RUDDER : TO DO LUCIO sealant on trailing edge and
Details

 04-27-2020
1.00
HS TO DO LUCIO rivet rear spar assembly
Details

 04-27-2020
1.00
ELEVATOR: TODO LUCIO trailing edge double flush ri
Details

 04-26-2020
1.00
TAILCONE mark NO dimple holes and dimple bulkheads
Details

 04-26-2020
1.50
TAILCONE dimple F-1047 stiffeners
Details

 04-25-2020
3.00
TAILCONE dimpling skins
Details

 04-24-2020
2.00
TAILCONE dimple skins
Details

 04-24-2020
2.00
TAILCONE dimple skins
Details

 04-24-2020
3.00
TAILCONE dimple F-824B cover plates for #6 screws
Details

 04-23-2020
0.20
TAILCONE Eyebolt hole
Details

 04-23-2020
0.50
TAILCONE dimble F-1012B, F-1012A F-1014
Details

 04-23-2020
1.00
TAILCONE Countersink rudder stop and dimple rudder
Details

 04-22-2020
2.50
TAILCONE holes and edge deburring
Details

 04-21-2020
3.50
TAILCONE holes and edges deburring
Details

 04-20-2020
2.50
TAILCONE deburr edges and skins
Details

 04-19-2020
0.50
TAILCONE dimple F-1006
Details

 04-19-2020
4.00
TAILCONE deburr holes and edges
Details

 04-18-2020
4.00
TAILCONE Deburr holes and Edges
Details

 04-18-2020
1.00
F-1074 X Stiffener wrongly positioned
Details

 04-15-2020
1.00
TAILCONE Prepare F-1047F Left and Right
Details

 04-15-2020
2.00
TAILCONE Position and matchdrill F-1047F Left and
Details

 04-14-2020
1.50
TAILCONE stiffener F-1047 G L&R replacement
Details

 04-11-2020
2.00
ELEVATOR blind rivet ribs halves with LP4-3
Details

 04-10-2020
2.00
RUDDER riveted bottom rib, spar, top and counterba
Details

 04-09-2020
0.50
RUDDER Cleco front spar to shear clips
Details

 04-09-2020
2.00
ELEVATOR: Rivet second skin
Details

 04-08-2020
1.50
RUDDER Clean tank sealant on trailing edge holes
Details

 04-07-2020
1.00
ELEVATOR Scuffing for Foam Inserts
Details

 04-07-2020
2.00
ELEVATOR rivet skin to spars
Details
       

 03-30-2020
8.00
HS rivet skin to ribs and stringers and ribs
Details
       

 03-29-2020
2.00
ELEVATOR rivet the E-1008B Halves to spar on both
Details

 03-17-2020
3.00
TAILCONE disassemble the tailcone
Details

 03-17-2020
5.00
HS Rivet skins to front spar web
Details
       

 03-16-2020
0.50
HS Rivet Inspar Ribs
Details
     

 03-15-2020
4.00
HS skin on cradles and cleco structure rivet front
Details

 03-14-2020
1.50
HS Riveting Inspar Ribs
Details
       

 03-13-2020
2.00
HS Rivet stringer and stringer web assembly
Details
     

 03-12-2020
0.75
HS Rivet HS-912 hinge brackets
Details

 03-12-2020
1.00
HS rivet HS-906 doubler to rear HS spar
Details

 03-12-2020
2.00
HS Rivet HS Doubler, Front spar caps and bracket t
Details
       

 03-12-2020
0.50
HS Bolt Hinge Bracket assembly to rear spar
Details

 03-11-2020
0.50
RUDDER Rivet reinforcement plates to spar
Details

 03-11-2020
0.50
RUDDER Rivet R-1010 Shear clips to stiffeners
Details

 03-11-2020
1.00
RUDDER back rivet top and bottom rib
Details

 03-10-2020
2.50
RUDDER back rivet R-1015 stiffeners to skins
Details

 03-07-2020
1.00
TAILCONE Shoulder Harness anchors
Details

 03-07-2020
0.50
TAILCONE remoce triangle on side skin
Details

 03-07-2020
4.00
TAILCONE Aft deck drilling
Details

 03-07-2020
4.00
ELEVATOR Tip ribs riveting and Spar Doubler riveti
Details

 03-07-2020
4.00
ELEVATOR rivet reinforcement horns and root ribs
Details
     

 03-07-2020
0.50
ELEVATOR Bend Skin Edge
Details

 03-03-2020
2.00
TAILCONE fabricate Stabilizer support angle and El
Details

 02-29-2020
4.00
TAILCONE position top skins and matchdrill
Details

 02-29-2020
4.00
TAILCONE Matchdrill skins into stiffeners
Details

 02-20-2020
14.00
EMPENNAGE Priming of all the VS, HS, Elevator and
Details
       

 02-17-2020
8.00
EMPENNAGE Surface Preparation for Priming (second
Details

 02-16-2020
9.00
EMPENNAGE Surface Preparation
Details

 02-15-2020
3.00
TAILCONE Matchdrill longerons
Details

 02-15-2020
1.00
TAILCONE clecoing the aft deck
Details

 02-08-2020
2.00
TAILCONE matchdrill stiffeners
Details

 02-08-2020
0.50
TAILCONE Make F-1010B spacer
Details

 02-08-2020
1.00
TAILCONE final drill Bellcrank andles
Details

 02-08-2020
5.00
TAILCONE F-1012AB final assembly
Details

 02-08-2020
0.50
TAILCONE Bellcrank ribs matchdrilling
Details

 02-08-2020
1.50
TAILCONE Bellcrank angle drilling
Details

 02-07-2020
0.50
TAILCONE separate and deburr bellcrank rib angle
Details

 02-07-2020
5.00
TAILCONE preassembly Tailcone
Details

 02-04-2020
2.00
TAILCONE F1006A-B-C-D deburr and drill
Details

 02-04-2020
2.00
TAILCONE deburr and final drill F-1007
Details

 02-01-2020
3.00
TAILCONE Longeron Preparation and Bending
Details

 02-01-2020
0.50
TAILCONE HS Attachment Bar
Details

 02-01-2020
2.00
ELEVATOR Countersink and dimple E-1007 spar
Details

 02-01-2020
0.50
ELEVATOR check angle on Front and Rear Elevator Sp
Details

 01-31-2020
3.00
ELEVATOR reassembly everything with Lucio to cross
Details

 01-19-2020
1.00
TAILCONE 1010 Bulkhead preassembly and drilling
Details

 01-19-2020
1.50
TAILCONE 1008 Bulkhead deburr and preassembly
Details

 01-18-2020
4.00
TAILCONE Stiffeners fabrication
Details

 01-18-2020
1.25
TAILCONE HS attachment angle fabrication
Details

 01-18-2020
1.00
TAILCONE F1011 Bulkhead preassembly
Details

 01-18-2020
0.50
TAILCONE Deburring F1010 bulkhead
Details

 01-16-2020
1.00
TAILCONE Fabricate rudder cable angle
Details

 01-16-2020
1.00
TAILCONE bulkhead 1012 preassembly
Details

 01-11-2020
1.00
TAILCONE Tie down trim and tap 3/8 16
Details

 01-11-2020
2.50
ELEVATOR dimple tip ribs assembly
Details

 01-11-2020
1.00
ELEVATOR dimple flanges on rood ribs
Details

 01-06-2020
3.00
ELEVATOR Dimple skins
Details

 01-06-2020
2.00
ELEVATOR Dimple and countersink spars
Details

 01-06-2020
4.00
ELEVATOR Deburr holes and edges
Details

 01-06-2020
1.50
ELEVATOR countersink trailing edge wedge
Details

 01-06-2020
1.00
ELEVATOR Checking spar flange angles
Details

 01-05-2020
1.00
TAILCONE Attachment bar straighten
Details

 01-04-2020
3.00
ELEVATOR disassmbly and mark
Details

 01-03-2020
0.50
ELEVATOR trim tab anchor brackets final drill
Details

 01-03-2020
1.00
ELEVATOR trim cover plate nutplate drill
Details

 01-03-2020
3.00
ELEVATOR Skin matchdrilling 84° trailing edge dril
Details

 01-02-2020
0.50
ELEVATOR Trim access plates matchdrill
Details

 01-02-2020
1.00
ELEVATOR tip rib and closing skin preassembly
Details

 01-02-2020
5.00
ELEVATOR spar / root rib gusset
Details

 01-02-2020
0.50
ELEVATOR skin close out tabs matchdrilling
Details

 01-02-2020
1.75
ELEVATOR preassemble and matchdrill
Details

 01-02-2020
1.00
ELEVATOR match drill skins (partial)
Details

 01-02-2020
0.50
ELEVATOR horns preassemble and match drill
Details

 01-01-2020
1.50
ELEVATOR Skin preparation and bending
Details

 01-01-2020
2.00
ELEVATOR Preassemlby and matchdrill
Details

 01-01-2020
1.25
ELEVATOR Front Spar preparation
Details

 01-01-2020
1.50
ELEVATOR counterbalance ribs preassembly
Details

 12-31-2019
7.00
ELEVATOR parts deburring and preparing
Details

 12-18-2019
1.00
ELEVATOR shear clips preparation
Details

 12-18-2019
4.00
ELEVATOR deburr elevator ribs shear clips skins an
Details

 12-15-2019
4.00
HS countersink spars and stringers
Details

 12-14-2019
7.00
HS dimple skins and flanges
Details

 12-03-2019
2.00
HS mark and disassemble
Details

 12-03-2019
4.00
HS final drill skin #40
Details

 11-23-2019
3.00
HS Preassembly HS structure
Details

 11-23-2019
2.00
HS preassembly horizontal stabilizer
Details

 11-23-2019
2.00
HS final drill structure
Details

 11-23-2019
2.00
HS debur skins and prepare for preassembly
Details

 11-23-2019
0.50
HS bend two inspar ribs
Details

 11-21-2019
2.00
HS fabricate 4 cradles
Details

 11-20-2019
2.00
VS redone rivets with Lucio's Support
Details
       

 10-27-2019
1.00
HS prepare inspar ribs
Details

 10-27-2019
4.00
HS nose rib preparation
Details

 10-27-2019
3.00
HS Disassemble mark and prime spars
Details

 10-25-2019
0.50
HS prepare inspar ribs type A and B
Details

 10-25-2019
1.00
HS Countersink front spar doubler and final drill
Details

 10-24-2019
1.50
HS Front spar doubler and attachment brackets
Details

 10-24-2019
2.00
HS Elevator attachment bracket fabrication
Details

 10-22-2019
2.50
HS Spar caps deburring
Details

 10-21-2019
2.00
HS Spar Caps final drill
Details

 10-19-2019
2.50
HS Trim Front Spar Caps, long and short stringers
Details

 10-19-2019
5.00
HS rear spar assembly & Prime
Details

 10-19-2019
0.50
HS inboard hinge bracket
Details

 10-08-2019
1.00
RUDDER Straigthened rudder trailing edge
Details

 10-02-2019
1.00
VS rivetd spar flanges of bottom ribs.
Details

 10-02-2019
1.00
VS rivet vertical stabilizer structure
Details

 10-02-2019
1.00
VS rivet top rib and clecoed bottom rib
Details

 10-02-2019
0.50
VS rivet skin to rear spar
Details

 10-02-2019
1.00
VS rivet skin to middle rib and top rib
Details

 10-02-2019
0.50
VS rivet skin to front spar
Details

 10-02-2019
1.50
VS rivet rear spar caps to spar
Details

 10-02-2019
1.00
VS rivet middle nose rib forward
Details

 10-02-2019
1.00
VS cleco skin to structure
Details
     

 09-25-2019
2.50
RUDDER rivet bottom and top ribs
Details

 09-25-2019
2.00
RUDDER Leading Edge
Details

 09-25-2019
4.00
RUDDER double flush rivet trailing edge
Details

 09-24-2019
1.00
RUDDER rivet reinforcement and nutplates to spar
Details

 09-23-2019
2.00
VS rivet top hinge brackets and front spar doubler
Details

 09-23-2019
2.00
RUDDER Rivet spar to shear clips
Details
     

 09-22-2019
2.50
VS rivet rear spar assembly
Details

 09-21-2019
3.00
VS assembly rudder, blind rivet stiffener
Details
       

 09-18-2019
4.00
VS prime VS assembly
Details
     

 09-15-2019
2.00
RUDDER Top rib, bottom rib back riveting
Details

 09-15-2019
1.50
RUDDER Rivet Spar, Doubler, Horn and Bottom Rib
Details
       

 09-15-2019
2.50
RUDDER back rivet stiffener to skin
Details

 08-14-2019
4.00
RUDDER Clean and Prime rudder parts
Details

 08-11-2019
2.00
VS front spar doubler, rudder stop preparation
Details

 08-10-2019
8.00
VS dimple VS skin, ribs, spars
Details

 08-10-2019
2.00
RUDDER countersink trailing edge for skin
Details

 08-09-2019
5.50
VS assemble, final drill dimple skins and structur
Details

 08-09-2019
5.00
RUDDER skind bend, disassemble and debur
Details

 08-07-2019
4.00
RUDDER assembly trailing edge
Details

 08-05-2019
8.00
VS remove primer from VS assembly.
Details

 07-30-2019
1.00
RUDDER final dril shear clip / Stiffenersl
Details

 07-30-2019
1.00
RUDDER debur skins, remove plastic
Details

 07-30-2019
1.00
RUDDER complete structur with top and bottom rib
Details

 07-28-2019
2.50
RUDDER assembly stiffener and matchdrill
Details

 07-28-2019
2.00
RUDDER horn bottom rib assembly
Details

 07-27-2019
1.00
RUDDER Ribs assembly matchdrill deburr
Details

 07-07-2019
4.00
VS prime VS parts (first attempt)
Details

 06-25-2019
3.00
RUDDER R1015 stiffener fabrication
Details

 06-25-2019
2.00
RUDDER rib separation, R1010 shear clip part sepa
Details

 06-24-2019
2.00
VS front spar doubler, rudder stop preparation
Details

 06-22-2019
8.00
VS dimple, countersink, deburr,
Details

 06-20-2019
5.00
VS assemble skin, matchdrill mark parts
Details

 06-02-2019
1.00
VS assemble and matchdrill
Details

 06-01-2019
1.00
VS machine countersink rear spar
Details

 06-01-2019
2.00
VS deburr all components and check straight
Details

 05-30-2019
1.50
VS assemple rear spar and match d
Details
     

 05-29-2019
3.00
VS nest flanges and match drill
Details

 05-28-2019
2.00
VS trim flange VS1014
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.