KitLog pro

Powered By Kitlog Pro v2.0

Larry and Eddie - Sportsman
Work Logs Found: 38
Category Work Time: 92 Hours
 Date
Hours
Work Log Summary

Details

 10-16-2012
3.00
Cut the Filler Neck Opening in the Upper Outboard
Details
       

 10-15-2012
3.00
Fit the fuel lines (aux tank)
Details
       

 10-14-2012
2.00
Fit the fuel lines (redo)
Details
       

 09-21-2012
1.50
Fit the fuel lines
       

 08-23-2012
2.00
Finish left wing vent lines
Details
       

 08-05-2012
3.00
Route Vent Lines
       

 08-04-2012
5.00
Install Vent and Fuel Line Fittings in the Tanks a
Details
       

 07-22-2012
5.00
Rivet Transfer Pump Doubler
Details
       

 05-23-2012
2.00
Position, Drill and Rivet the Transfer Pump Mounti
     

 05-22-2012
3.00
Position, Drill and Rivet the Transfer Pump Mounti
     

 05-21-2012
1.00
Install Bumpers on the Tank Perimeter
Details
       

 05-20-2012
3.00
Position and Drill the Aux Tank Mounting Channels
Details
       

 05-20-2012
5.00
Cut Hole in the Upper Wing Skin for the Filler Nec
Details
       

 05-18-2012
2.50
Make a Cutout in the Root Rib for the Fuel Gauge M
Details
       

 05-18-2012
1.00
Drill Holes in the Root Rib for the Main and Retur
Details
       

 05-18-2012
3.00
Drill Holes in Root Rib for the Main and Return Fu
Details
       

 05-17-2012
3.50
Refining Hole in the Lower Wing Skin for the Main
Details
     

 05-17-2012
1.00
Make a Cutout in the Root Rib for the Fuel Gauge M
Details
       

 04-29-2012
2.00
Install the Drain Valve
       

 04-29-2012
2.00
Install header tanks
Details
       

 04-29-2012
1.00
Drill the Drain Valve Holes in the Fuselage Floor
       

 04-24-2012
2.00
Creating jack point/step part 2
Details
       

 04-23-2012
3.00
Creating jack point/step
Details
       

 04-21-2012
1.00
Removing front baffling to remove firewall screws
Details
     

 04-21-2012
5.00
Brake Line Installation
Details
       

 04-15-2012
3.00
Preliminary brake line installation
Details
       

 01-17-2012
0.50
Test Fit the Upper-Surface Hat Sections
Details
       

 01-17-2012
2.50
lnstall "Bumpers" Around the Perimeter of the Tank
Details
       

 01-16-2012
3.50
Test Fit the Upper-Surface Hat Sections
Details
       

 01-16-2012
3.00
Make a Cutout in the Root Rib for the Fuel Gauge M
Details
       

 01-16-2012
0.00
Make a Cutout in the Root Rib for the Fuel Gauge M
Details
       

 01-16-2012
1.00
Apply Anti-Chafe Tape to the Hat Section Stiffener
Details
       

 01-15-2012
3.00
Drill a Hole in the Lower Wing Skin for the Main T
Details
       

 01-15-2012
0.00
Drill a Hole in the Lower Wing Skin for the Main T
Details
       

 01-10-2012
2.50
Figuring out the brake system
Details
     

 01-03-2012
1.00
Test fit the Main Fuel Tank (Left)
Details
       

 04-20-2006
4.00
Mount the Rudder Pedals on the Rudder Control Weld
     

 04-20-2006
3.00
Install the Brake Master Cylinders
     










Copyright © 2001-2024 Matronics. All Rights Reserved.