Powered By Kitlog Pro v2.0
THOMAS'S WEB SITE
Cherry BX-2
Tank
Work Logs Found:
60
Category Work Time:
52 Hours
Date
Hours
Work Log Summary
Details
04-15-2016
2.00
Venting System
Details
04-15-2016
0.00
Venting System
Details
04-14-2016
2.00
Venting System
Details
04-13-2016
1.00
Venting System
Details
03-25-2016
3.00
Venting System
Details
03-12-2016
3.00
Venting System
Details
03-12-2016
3.00
Venting System
Details
03-11-2016
5.00
Venting System
Details
03-10-2016
6.00
Venting System
Details
03-10-2016
0.00
Venting System
Details
03-10-2016
0.00
Venting System
Details
02-29-2016
6.00
Fueltank Installation
Details
02-29-2016
0.00
Fueltank Installation
02-25-2016
5.00
Fueltank Installation
Details
02-25-2016
0.00
Fueltank Installation
02-21-2016
1.00
Fueltank Installation
Details
02-17-2016
6.00
Fueltank Installation
Details
02-17-2016
3.00
Fueltank Installation
01-21-2012
0.00
Tank Air Test
Details
01-21-2012
0.00
Tank Air Test
Details
01-20-2012
0.00
Sealant Types
01-20-2012
0.00
Painting the Innner Side with Fuel Resistant Resin
Details
01-18-2012
0.00
Taking the Tank out of its Jig
01-17-2012
0.00
Laminating Tankdeck
01-16-2012
0.00
Bonded Tank into the Tank Deck
01-06-2012
0.00
Smoothened up Surfaces for Best Sealant
01-06-2012
0.00
Painted Innerside of Tank with Fuel Resistant Resi
Details
12-22-2011
0.00
Ram Air Tube Installation
12-21-2011
0.00
Ram Air Hose Installation
12-20-2011
0.00
Tank Filler Cap
Details
12-19-2011
0.00
Tank Water Test
Details
12-19-2011
0.00
Tank Water Test
Details
12-15-2011
0.00
Bonding the Tank Sump to the Tank
12-12-2011
0.00
Bonding the Tank Sump to the Tank
12-06-2011
0.00
Tank Sump
Details
12-06-2011
0.00
Tank Inspection Panel
12-05-2011
0.00
Tank Sump
12-03-2011
0.00
Tank Sump
Details
12-03-2011
0.00
Tank Sump
12-03-2011
0.00
Fuel Sump Connectors
12-02-2011
0.00
Tank Sump
Details
11-30-2011
0.00
Laminating the Sump
11-28-2011
0.00
Tank Sump
11-23-2011
0.00
Vacuum Bagged the Bottom with Glass
Details
11-18-2011
0.00
Installing the Tank Bottom
Details
11-16-2011
0.00
Fitting the Walls to the Deck
11-03-2011
0.00
Filler Cap Bonding
11-03-2011
0.00
Building the Tank together
Details
11-02-2011
0.00
Filler Cap Fitting
Details
10-31-2011
0.00
Filler Cap Fitting
10-29-2011
0.00
Filler Cap
10-27-2011
0.00
Filler Cap
10-05-2011
0.00
Tank Inspection Panel
10-05-2011
0.00
Bonding the Insopection Panel
Details
09-30-2011
0.00
Tank Inspection Panel
09-30-2011
0.00
Tank Inspection Panel
09-29-2011
0.00
Laminating Tank Deck and Walls with Vacuum
09-27-2011
0.00
Cutting the Peel Ply and Breather
09-27-2011
0.00
Cutting the Foam
07-30-2011
6.00
Building the Jig
SITE NAVIGATION
Contact Builder
Cherry BX-2 Home
Category
# Logs
# Hours
All
482
4021
Avionics/Instrument
8
12
Electrics/Instrument
8
12
Engine
63
176
Fuselage
151
306
Horizontal Stab.
32
68
Miscellaneous
1
2
Prebuilding Hours no
1
3000
Projectinspection
5
10
Prop
12
42
Retractable Gear
97
252
Seating
14
21
Stand
4
15
Tank
60
52
Vertical Stabilizer
19
43
Wing Loading Test
4
10
Workshop
3
Copyright © 2001-2024 Matronics. All Rights Reserved.