Powered By Kitlog Pro v2.0
THOMAS'S WEB SITE
Cherry BX-2
All
Work Logs Found:
474
Category Work Time:
4010 Hours
Date
Hours
Work Log Summary
Details
11-04-2017
3.00
Applying the last PU Clear Coat Layer
Details
11-03-2017
4.00
Fitting the Propeller
Details
08-16-2017
4.00
Spinner Installation
Details
08-07-2017
0.00
Spinner Installation
Details
08-07-2017
7.00
Spinner Installation
Details
08-02-2017
3.00
Spinner Installation
Details
07-27-2017
0.00
Spinner Installation
Details
07-27-2017
6.00
Spinner Installation
Details
07-20-2017
4.00
Rear Spinner Bulkhead Installation
Details
07-18-2017
3.00
Propeller Faceplate
07-14-2017
2.00
Propeller Faceplate
Details
07-12-2017
3.00
Generator Assembly
Details
07-11-2017
6.00
Generator Assembly
Details
07-06-2017
6.00
Generator Assembly
Details
07-04-2017
6.00
Generator Assembly
07-01-2017
3.00
Generator Assembly
Details
05-23-2017
8.00
Generator Pulley
Details
05-23-2017
0.00
Generator Pulley
05-23-2017
0.00
Generator Pulley
05-22-2017
5.00
Generator Pulley
Details
05-19-2017
5.00
Generator Pulley
Details
05-18-2017
4.00
Generator Pulley
Details
05-16-2017
4.00
Spinner and Bulkhead
Details
05-16-2017
0.00
Spinner and Bulkhead
Details
05-15-2017
4.00
Spinner Bulkhead
Details
05-13-2017
6.00
Spinner Bulkhead
Details
05-13-2017
0.00
Spinner Bulkhead
Details
05-12-2017
3.00
Counter Weight
Details
05-11-2017
1.00
Spinner Bulkhead
Details
05-11-2017
6.00
Counter Weight
Details
05-11-2017
0.00
Counter Weight
05-11-2017
2.00
Counter Weight
Details
05-09-2017
4.00
Lead Weigth for Aerodynamical Balancing
Details
05-08-2017
4.00
Propeller
Details
05-06-2017
2.00
Canopy
Details
05-03-2017
2.00
Canopy Transition
Details
05-02-2017
5.00
Canopy Transition
Details
05-02-2017
0.00
Canopy Transition
Details
04-20-2017
4.00
Creating the Spinner
Details
04-20-2017
0.00
Creating the Spinner
04-19-2017
6.00
Creating the Spinner
Details
04-19-2017
0.00
Creating the Spinner
04-19-2017
0.00
Creating the Spinner
04-18-2017
4.00
Creating the Spinner negativ Mold
Details
04-12-2017
4.00
Spinner Bulkhead
Details
04-12-2017
4.00
Spinner Bulkhead
04-11-2017
4.00
Creating the Spinner negativ Mold
Details
04-11-2017
0.00
Creating the Spinner negativ Mold
03-28-2017
3.00
Creating the Spinner negativ Mold
Details
03-27-2017
4.00
Creating the Spinner negativ Mold
Details
03-27-2017
4.00
Creating the Spinner negativ Mold
03-24-2017
3.00
Canopy Top Lock
Details
03-21-2017
2.00
Spinner Mold
Details
03-20-2017
10.00
Propeller Lugs
Details
03-18-2017
2.00
Canopy Lock
Details
03-04-2017
10.00
Spinner and Bulkhead Mold
Details
03-04-2017
0.00
Spinner and Bulhead Mold
02-24-2017
3.00
Canopy
Details
02-24-2017
0.00
Canopy
02-24-2017
0.00
Canopy
02-23-2017
4.00
Canopy
Details
02-22-2017
4.00
Canopy
Details
02-21-2017
5.00
Propeller Spinner
Details
02-18-2017
4.00
Propeller
Details
02-16-2017
5.00
Canopy
Details
02-11-2017
3.00
Canopy
Details
02-11-2017
0.00
Canopy
02-09-2017
3.00
Propeller
Details
02-06-2017
4.00
Canopy
Details
02-06-2017
1.00
Canopy
Details
02-04-2017
2.00
Canopy
Details
02-04-2017
2.00
Canopy
Details
02-03-2017
5.00
Canopy
Details
02-03-2017
0.00
Canopy
02-02-2017
5.00
Canopy
Details
01-31-2017
5.00
Canopy
Details
01-31-2017
0.00
Canopy
01-30-2017
3.00
Canopy
Details
01-28-2017
2.00
Canopy
Details
01-28-2017
0.00
Canopy
01-27-2017
4.00
Canopy
Details
01-26-2017
4.00
Canopy
Details
01-25-2017
3.00
Sliding Canopy
Details
01-25-2017
3.00
Rear Canopy
Details
01-25-2017
1.00
Propeller
Details
01-25-2017
1.00
Canopy
Details
01-24-2017
1.00
Canopy Latch
Details
01-24-2017
5.00
Canopy
Details
01-23-2017
2.00
Workbench
Details
01-13-2017
4.00
Canopy Sealing
Details
01-13-2017
0.00
Canopy Sealing
01-12-2017
6.00
Canopy Sealing
Details
01-12-2017
0.00
Canopy Sealing
Details
01-12-2017
0.00
Canopy Sealing
01-11-2017
3.00
Canopy Sealing
Details
01-11-2017
0.00
Canopy Sealing
01-11-2017
3.00
Canopy Frame
Details
01-10-2017
5.00
Different Items prior Canopy bonding
Details
01-09-2017
3.00
Turtledeck Bulkhead
Details
01-09-2017
3.00
Propeller
Details
01-07-2017
1.00
Wiring Diagramm
Details
01-07-2017
2.00
Turtledeck Bulkhead
Details
01-06-2017
0.00
Propeller Bolts 3/8-24 UNF
Details
01-05-2017
2.00
Turtledeck Bulkhead
Details
01-05-2017
3.00
Propeller
Details
01-05-2017
1.00
Canopy Track Support
Details
01-04-2017
3.00
Turtledeck Bulkhead
Details
01-04-2017
1.00
Canopy front Seal
Details
01-03-2017
2.00
Canopy Track Support
Details
01-03-2017
2.00
Canopy front Seal
Details
01-02-2017
3.00
Propeller
Details
01-01-2017
2.00
Propeller
Details
12-31-2016
0.50
Propeller
Details
12-30-2016
2.00
Propeller
Details
12-29-2016
3.00
Propeller
Details
12-29-2016
0.00
Propeller
12-28-2016
6.00
Wiring Diagram
Details
12-14-2016
4.00
Reinforcement Main Gear Axle
Details
12-12-2016
6.00
Propeller Extension
12-10-2016
2.00
Propeller Extension
12-10-2016
0.00
Propeller Extension
12-09-2016
4.00
Propeller Extension
Details
12-08-2016
0.00
Rear Canopy
Details
11-11-2016
6.00
Shaping the Propeller
Details
11-05-2016
0.50
Canopy
Details
09-14-2016
2.00
Modification to the Nose Wheel Installation
09-11-2016
2.00
Modification to the Nose Wheel Installation
Details
08-01-2016
0.00
Gear Cable Protections
08-01-2016
0.00
Gear Cable Protections
07-30-2016
6.00
Gear Cable Protections
Details
07-30-2016
0.00
Gear Cable Protections
07-28-2016
4.00
Gear Cable Protections
Details
07-27-2016
4.00
Nosewheel and Rudder Steering
Details
07-26-2016
6.00
Nosewheel and Rudder Steering
Details
07-26-2016
0.00
Nosewheel and Rudder Steering
Details
07-26-2016
1.00
Braking Reservoir
Details
07-20-2016
1.00
Nosewheel and Rudder Steering
Details
07-19-2016
6.00
Nosewheel and Rudder Steering
Details
07-19-2016
0.00
Nosewheel and Rudder Steering
07-17-2016
3.00
Nosewheel and Rudder Steering
Details
07-16-2016
3.00
Nosewheel and Rudder Steering
Details
07-15-2016
6.00
Installing Rudder- and Nosewheelsteering Cables
Details
07-14-2016
1.00
Pedal Installation
Details
07-14-2016
4.00
Nosewheel and Rudder Steering
Details
07-14-2016
0.00
Nosewheel and Rudder Steering
07-13-2016
7.00
Pulley and Rudder/Nosewheelsteering Set-up
Details
07-13-2016
0.00
Pulley and Rudder/Nosewheelsteering Set-up
Details
07-13-2016
0.00
Pulley and Rudder/Nosewheelsteering Set-up
07-13-2016
0.00
Pedal Installation
Details
07-13-2016
0.00
Pedal Installation
07-13-2016
0.00
Pedal Installation
07-10-2016
2.00
Pulley Installation for Rudder and Steering D027
Details
07-08-2016
3.00
Trim Cable Guidance D97
Details
07-08-2016
0.00
Trim Cable Guidance D97
07-07-2016
1.00
Installing the Turtledeck
Details
07-07-2016
3.00
Elevator Trim
Details
07-07-2016
0.00
Elevator Trim
07-07-2016
2.00
Beacon Installation
Details
07-06-2016
6.00
Installing the Turtledeck
Details
07-06-2016
0.00
Installing the Turtledeck
07-06-2016
1.00
Beacon Installation
Details
07-05-2016
3.00
Installing the Turtledeck
Details
07-05-2016
0.00
Installing the Turtledeck
07-05-2016
0.00
Installing the Turtledeck
07-04-2016
2.50
Installing the Turtledeck
Details
07-04-2016
0.00
Installing the Turtledeck
07-04-2016
0.50
Installing the Beacon
Details
07-02-2016
2.00
Sealing the Wood
Details
07-01-2016
4.00
Elevator Drive Support D111
Details
07-01-2016
0.00
Elevator Drive Support D111
Details
07-01-2016
0.00
Elevator Drive Support D111
07-01-2016
0.00
Elevator Drive Support D111
Details
06-30-2016
6.00
Construction of Canopy Frame
Details
06-30-2016
0.00
Construction of Canopy Frame
06-30-2016
0.00
Construction of Canopy Frame
06-30-2016
0.00
Construction of Canopy Frame
Details
06-27-2016
3.00
Construction of Canopy Frame
Details
06-27-2016
0.00
Construction of Canopy Frame
06-27-2016
0.00
Construction of Canopy Frame
06-25-2016
0.50
Construction of Canopy Frame
Details
06-24-2016
2.00
Construction of Canopy Frame
Details
06-24-2016
0.00
Construction of Canopy Frame
06-23-2016
0.00
Engine Oil Cooler
Details
06-23-2016
4.00
Construction of Canopy Frame
Details
06-23-2016
0.00
Braking System
Details
06-22-2016
6.00
Construction of Canopy Frame
Details
06-22-2016
0.00
Construction of Canopy Frame
06-22-2016
0.00
Construction of Canopy Frame
06-17-2016
6.00
Construction of Canopy Frame
Details
06-17-2016
0.00
Construction of Canopy Frame
06-17-2016
0.00
Construction of Canopy Frame
06-16-2016
2.00
Seating Adjumstments
Details
06-16-2016
4.00
Construction of Canopy Frame
06-16-2016
0.00
Construction of Canopy Frame
06-16-2016
0.00
Construction of Canopy Frame
06-14-2016
4.00
Engine Installation
Details
06-14-2016
0.00
Engine Installation
06-14-2016
0.00
Engine Installation
06-14-2016
0.00
Engine Installation
06-14-2016
2.00
Construction of Canopy Frame
Details
06-11-2016
4.00
Construction of Canopy Frame
Details
06-11-2016
0.00
Construction of Canopy Frame
06-10-2016
6.00
Construction of Canopy Frame
Details
06-10-2016
0.00
Construction of Canopy Frame
06-10-2016
0.00
Construction of Canopy Frame
06-10-2016
0.00
Construction of Canopy Frame
06-09-2016
6.00
Construction pf Canopy Frame
Details
06-09-2016
0.00
Construction of Canopy Frame
06-09-2016
0.00
Construction of Canopy Frame
06-08-2016
6.00
Construction of Canopy Frame
Details
06-08-2016
0.00
Construction of Canopy Frame
06-08-2016
0.00
Construction of Canopy Frame
06-07-2016
3.00
Construction of Canopy Frame
Details
06-04-2016
3.00
Construction of Canopy Frame
Details
05-31-2016
6.00
Construction of Canopy Frame
Details
05-31-2016
0.00
Construction of Canopy Frame
05-31-2016
0.00
Construction of Canopy Frame
Details
05-31-2016
0.00
Construction of Canopy Frame
05-31-2016
0.00
Construction of Canopy Frame
05-30-2016
3.00
Construction of Canopy Frame
Details
05-30-2016
0.00
Construction of Canopy Frame
Details
05-29-2016
4.00
Construction of Canopy Frame
05-29-2016
0.00
Construction of Canopy Frame
05-29-2016
0.00
Construction of Canopy Frame
05-27-2016
6.00
Construction of Canopy Frame
05-26-2016
6.00
Construction of Canopy Frame
Details
05-26-2016
0.00
Construction of Canopy Frame
05-26-2016
0.00
Construction of Canopy Frame
05-26-2016
0.00
Construction of Canopy Frame
05-24-2016
0.00
Construction of Canopy Frame
Details
05-24-2016
0.00
Construction of Canopy Frame
Details
05-24-2016
6.00
Construction of Canopy Frame
Details
05-23-2016
5.00
Construction of Canopy Frame
Details
05-19-2016
4.00
Construction of Canopy Frame
Details
05-18-2016
6.00
Construction of Canopy Frame
Details
05-18-2016
0.00
Construction of Canopy Frame
05-17-2016
0.00
Construction the Canopy Frame
05-17-2016
4.00
Construction of Canopy Frame
Details
05-02-2016
3.00
Installing the Surfaces to the Main Shaft
05-02-2016
0.00
Installing the Surfaces to the Main Shaft
05-02-2016
5.00
Installing the Surfaces to the Main Shaft
Details
05-01-2016
3.00
Installing the Surfaces to the Main Shaft
Details
04-30-2016
4.00
Installing the Surfaces to the Main Shaft
Details
04-29-2016
4.00
Installing the Surfaces to the Main Shaft
Details
04-28-2016
5.00
Installing the Surfaces to the Main Shaft
Details
04-28-2016
0.00
Installing the Surfaces to the Main Shaft
04-27-2016
3.00
Installing the Surfaces to the Main Shaft
Details
04-26-2016
4.00
Installing the Surfaces to the Main Shaft
Details
04-26-2016
0.00
Installing the Surfaces to the Main Shaft
04-21-2016
2.00
Venting System
Details
04-21-2016
2.00
Optional Bushing
Details
04-21-2016
0.00
Air Venting
04-21-2016
0.00
Air Venting
Details
04-20-2016
3.00
Optional Bushing
Details
04-20-2016
0.00
Optional Bushing
04-19-2016
2.00
Static Balancing
Details
04-19-2016
0.00
Static Balancing
04-19-2016
2.00
Optional Bushing
Details
04-19-2016
0.00
Optional Bushing
04-18-2016
4.00
Static Balancing
Details
04-18-2016
0.00
Static Balancing
04-18-2016
0.00
Static Balancing
04-18-2016
0.00
Static Balancing
04-15-2016
2.00
Venting System
Details
04-15-2016
0.00
Venting System
Details
04-15-2016
3.00
Studying Plans
Details
04-14-2016
2.00
Venting System
Details
04-13-2016
1.00
Venting System
Details
03-25-2016
3.00
Venting System
Details
03-12-2016
3.00
Venting System
Details
03-12-2016
3.00
Venting System
Details
03-11-2016
5.00
Venting System
Details
03-10-2016
6.00
Venting System
Details
03-10-2016
0.00
Venting System
Details
03-10-2016
0.00
Venting System
Details
03-07-2016
5.00
Changing Damper Installation
Details
03-07-2016
0.00
Changing Damper Installation
Details
03-07-2016
0.00
Changing Damper Installation
Details
03-01-2016
4.00
Changing Damper Installation
02-29-2016
6.00
Fueltank Installation
Details
02-29-2016
0.00
Fueltank Installation
02-25-2016
5.00
Fueltank Installation
Details
02-25-2016
0.00
Fueltank Installation
02-21-2016
1.00
Fueltank Installation
Details
02-17-2016
6.00
Fueltank Installation
Details
02-17-2016
3.00
Fueltank Installation
02-12-2016
3.00
Nose Wheel Shimmy Installation
Details
02-09-2016
3.00
Engine Mount Plate
Details
02-05-2016
0.00
Gear Latch Mechanism
Details
02-05-2016
6.00
Gear Latch Installation
02-04-2016
3.00
Gear Latch Mechanism
Details
02-04-2016
4.00
Busy with the Firewall
Details
02-03-2016
5.00
Installed the Nose Strut again
02-03-2016
0.00
Engine Mount
02-03-2016
0.00
Engine Mount
02-03-2016
0.00
Drilled Engine Mount Holes to the Firewall
Details
02-01-2016
1.00
Repositioned Nose Wheel Pivot
Details
01-23-2016
4.00
Installing the Gear Cables
Details
01-23-2016
0.00
Gear Test
01-23-2016
0.00
Gear Test
01-21-2016
2.00
Completed Main Gear Squat Switch Installation
Details
01-20-2016
3.00
Manufactured Steering Parts
Details
01-18-2016
3.00
Sealed off some Wood and drilled Holes for Steerin
01-15-2016
5.00
Nose Wheel Alignment
Details
01-14-2016
3.00
Some Minor Work
01-14-2016
0.00
Nose Wheel Damper Pivot
01-13-2016
0.00
Jacks
01-13-2016
2.00
Installed the Pick Up point for the Jacks
01-12-2016
5.00
Airplane Jack
01-12-2016
0.00
Airplane Jack
01-11-2016
2.00
Squat Switch Installation Main Gear
Details
01-11-2016
2.00
Nose Wheel Safety Latch
01-11-2016
0.00
Nose Wheel Safety Latch
Details
01-09-2016
2.00
Squat Switch Installation Main Gear
Details
01-08-2016
0.00
Nosewheel Squat Switch
01-08-2016
6.00
Nosewheel Safety Latch
Details
01-08-2016
0.00
Nosewheel Safety Latch
01-08-2016
0.00
Nosewheel Safety Latch
01-07-2016
7.00
Nosewheel Fork
Details
01-07-2016
0.00
Nosewheel Fork
01-07-2016
0.00
Nosewheel Fork
01-07-2016
0.00
Nosewheel Fork
01-07-2016
0.00
Nosewheel Fork
01-07-2016
0.00
Nosewheel Fork
01-06-2016
5.00
Gear Lever Mechanism
Details
01-06-2016
0.00
Gear Lever Mechanism
01-05-2016
0.00
Gear Lever Mechanism
Details
01-05-2016
0.00
Gear Lever Mechanism
Details
01-05-2016
5.00
Diverting Pulley Assembly
Details
01-05-2016
0.00
Diverting Pulley Assembly
01-04-2016
2.00
Reinforcement Diverting Pulley Assembly
01-04-2016
0.00
Reinforcement Diverting Pulley Assembly
01-02-2016
0.00
Reinforcement Diverting Pulley Assembly
Details
01-02-2016
2.00
Diverting Pulley Assembly
Details
01-01-2016
2.00
Gearlever Stopend
Details
01-01-2016
0.00
Gearlever Stopend
12-30-2015
6.00
Diverting Pulley Assembly
Details
12-30-2015
0.00
Diverting Pulley Assembly
Details
12-30-2015
0.00
Diverting Pulley Assembly
Details
12-30-2015
0.00
Diverting Pulley Assembly
Details
12-29-2015
4.00
Diverting Pulley Assembly
12-23-2015
2.50
Diverting Pulley Assembly
Details
12-23-2015
0.00
Diverting Pulley Assembly
12-22-2015
4.00
Diverting Pulley Assembly
Details
12-21-2015
4.00
Diverting Pulley Assembly
12-21-2015
0.00
Diverting Pulley Assembly
12-21-2015
0.00
Diverting Pulley Assembly
12-18-2015
2.00
D55/1
Details
12-18-2015
0.00
D55/1
12-17-2015
6.00
Finishing up D55/1
Details
12-17-2015
0.00
D55/1
12-17-2015
0.00
D55/1
Details
12-17-2015
0.00
D55/1
12-17-2015
0.00
D55/1
12-16-2015
0.00
Seilscheibe D55/1 Part 2
12-15-2015
0.00
Seilscheibe D55/1 part 3
Details
12-14-2015
30.00
SeilscheibeD 55/1 Part 3
Details
12-14-2015
0.00
Seilscheibe D55/1 Part 3
12-14-2015
0.00
Seilscheibe D 55/1 Part 3
12-01-2015
6.00
Seating Shell Support
Details
12-01-2015
0.00
Seating Shell Support
01-19-2015
15.00
Seating Shell Support
06-01-2012
0.00
Workshop Hochwald
04-04-2012
0.00
Stands on its own Legs
03-23-2012
4.00
Painting Main Gear Legs
02-03-2012
0.00
Preparing the Foam for the Cushions
01-21-2012
0.00
Tank Air Test
Details
01-21-2012
0.00
Tank Air Test
Details
01-20-2012
0.00
Sealant Types
01-20-2012
0.00
Painting the Innner Side with Fuel Resistant Resin
Details
01-18-2012
0.00
Taking the Tank out of its Jig
01-17-2012
0.00
Laminating Tankdeck
01-16-2012
0.00
Bonded Tank into the Tank Deck
01-11-2012
0.00
Fixation of Seating
01-06-2012
0.00
Smoothened up Surfaces for Best Sealant
01-06-2012
0.00
Painted Innerside of Tank with Fuel Resistant Resi
Details
12-22-2011
0.00
Ram Air Tube Installation
12-21-2011
0.00
Ram Air Hose Installation
12-20-2011
0.00
Tank Filler Cap
Details
12-19-2011
0.00
Tank Water Test
Details
12-19-2011
0.00
Tank Water Test
Details
12-15-2011
0.00
Bonding the Tank Sump to the Tank
12-12-2011
0.00
Bonding the Tank Sump to the Tank
12-06-2011
0.00
Tank Sump
Details
12-06-2011
0.00
Tank Inspection Panel
12-05-2011
0.00
Tank Sump
12-03-2011
0.00
Tank Sump
Details
12-03-2011
0.00
Tank Sump
12-03-2011
0.00
Fuel Sump Connectors
12-02-2011
0.00
Tank Sump
Details
11-30-2011
0.00
Laminating the Sump
11-28-2011
0.00
Tank Sump
11-23-2011
0.00
Vacuum Bagged the Bottom with Glass
Details
11-18-2011
0.00
Installing the Tank Bottom
Details
11-16-2011
0.00
Fitting the Walls to the Deck
11-03-2011
0.00
Filler Cap Bonding
11-03-2011
0.00
Building the Tank together
Details
11-02-2011
0.00
Filler Cap Fitting
Details
10-31-2011
0.00
Filler Cap Fitting
10-29-2011
0.00
Filler Cap
10-27-2011
0.00
Filler Cap
10-05-2011
0.00
Tank Inspection Panel
10-05-2011
0.00
Bonding the Insopection Panel
Details
09-30-2011
0.00
Tank Inspection Panel
09-30-2011
0.00
Tank Inspection Panel
09-29-2011
0.00
Laminating Tank Deck and Walls with Vacuum
09-27-2011
0.00
Cutting the Peel Ply and Breather
09-27-2011
0.00
Cutting the Foam
07-30-2011
6.00
Building the Jig
06-24-2011
0.00
Fitting of Seating to the Fuselage
Details
06-21-2011
0.00
Creating Side Rest for Seating
06-12-2011
0.00
Laminating upper Side
06-07-2011
0.00
Laminating the Seating
Details
06-06-2011
0.00
Laminating Bottom First
Details
06-06-2011
0.00
Cutting the Foam
06-01-2011
0.00
Preparing the Seat Form for Laminating
05-30-2011
0.00
Creating the Negative for the Seating
Details
05-25-2011
0.00
Creating a Negativ for the Seating
03-24-2011
5.00
Installing Nosegear Mechanism
02-26-2011
10.00
D131 Wingloading Plan
Details
02-26-2011
0.00
D 131 Wingloading
02-26-2011
0.00
D 131 Wing Loading Test
02-26-2011
0.00
D 131 Wing Loading Test
09-28-2010
10.00
Welding Jig
Details
05-11-2010
0.00
Moving over to a bigger Workshop
Details
04-15-2010
0.00
Positioning the Main Spar
04-12-2010
0.00
Floor Reinforcement
04-08-2010
0.00
Fuselage Laminated
04-08-2010
0.00
Fuselage gets to look like a Boat
04-07-2010
0.00
Laminating the Fuselage
Details
04-02-2010
0.00
Forming the Edges
04-01-2010
0.00
Fuselage Bottom
03-31-2010
0.00
Fit up the Fuselage Bottom
03-30-2010
0.00
Reinforcing the Vertical Fin
03-26-2010
0.00
Bonding the Vertical Stabilizer into Position
03-20-2010
20.00
Laminating Maingeartube at Pivot
03-19-2010
6.00
Constructing the Fuselage
03-17-2010
7.00
Firewall
03-16-2010
6.00
Firewall Assembly
Details
02-15-2010
0.00
Continental C-90
Details
02-07-2010
6.00
Constructing the Fuselage
02-06-2010
6.00
Constructing the Fuselage
02-06-2010
6.00
Constructing the Fuselage
Details
01-23-2010
6.00
Constructing the Fuselage
01-18-2010
10.00
Nosegear
01-16-2010
6.00
Nosewheelstrut
01-14-2010
8.00
Nosegear
Details
01-08-2010
5.00
Riveting the Drivetube
01-08-2010
0.00
Closing the Rivet
01-01-2010
5.00
Installing the Bearing
11-19-2009
0.00
Positioning of the Fuselage Sides around the Jig
11-19-2009
2.00
Levelling the Table for the Fuselage Assembling
11-19-2009
6.00
Constructing the Jig
11-18-2009
5.00
Checking Basic Gear Mechanism
11-16-2009
6.00
Wheels and Brakes
11-16-2009
0.00
Wheelattachment
11-11-2009
0.00
Brakes
10-30-2009
0.00
Building the Fuselage Sides
10-27-2009
0.00
Building the Fuselage Sides
10-26-2009
0.00
Building the Fuselage Sides
10-15-2009
0.00
Building the Fuselage Sides
09-11-2009
4.00
Gear Mechanism
08-27-2009
4.00
Gearmechanism
07-11-2009
5.00
Constructing the Retractable Gear Mechanism
05-05-2009
3.00
Producing correct Radius for the later Glassfibers
04-29-2009
3.00
Main Gear Legs
01-01-2009
0.00
Workshop Birsfelden
01-01-2009
0.00
Workshop Birsfelden
Details
08-26-2008
0.00
Projectinspection SN 180 Heimberg
08-26-2008
0.00
Projectinspection SN 180 Heimberg
08-26-2008
0.00
Projectinspection SN 180 Heimberg
08-26-2008
0.00
Projectinspection SN 180 Heimberg
08-26-2008
10.00
Inspection of SN 180 Project in Heimberg
01-01-2008
3000.00
Prebuilding Hours not yet posted
SITE NAVIGATION
Contact Builder
Cherry BX-2 Home
Category
# Logs
# Hours
All
482
4021
Avionics/Instrument
8
12
Electrics/Instrument
8
12
Engine
63
176
Fuselage
151
306
Horizontal Stab.
32
68
Miscellaneous
1
2
Prebuilding Hours no
1
3000
Projectinspection
5
10
Prop
12
42
Retractable Gear
97
252
Seating
14
21
Stand
4
15
Tank
60
52
Vertical Stabilizer
19
43
Wing Loading Test
4
10
Workshop
3
Copyright © 2001-2024 Matronics. All Rights Reserved.