My Airplane Projects
Work Logs Found: 93
Category Work Time: 376 Hours
 Date
Hours
Work Log Summary

Details

 11-15-2010
4.00
Bled brakes again, worked on PAP tasks.
Details
       

 11-11-2010
5.00
Filled brake system. Observed air bubbles.
Details
       

 10-22-2010
2.00
Installed placards.
Details
       

 10-21-2010
2.50
Finished data cable, installed tunnel cover.
Details
       

 10-20-2010
4.00
Installed seats, began work on data cable.
Details
       

 10-19-2010
5.00
Worked on miscellaneous finish items.
Details
       

 10-16-2010
5.00
Sanded final skim coat of epoxy.
Details
     

 10-15-2010
6.00
Coated fiberglass, installed pump noise filter.
Details
       

 10-01-2010
6.00
Finished tail cone fitting.
Details
       

 09-23-2010
6.00
Worked on fitting the tail cone.
Details
       

 06-30-2010
8.00
Cowling, exhaust, cooling.
Details
       

 06-29-2010
8.00
Installed cowl hinges.
Details
     

 06-27-2010
2.00
Worked on cowl fit.
Details
       

 06-26-2010
2.00
Worked on lower cowl fit.
Details

 06-25-2010
2.00
Retorqued engine bolts, worked on cowling.
Details

 06-19-2010
4.00
Mounted prop, worked fiberglass.
Details
     

 05-23-2010
2.00
Met with Rob, worked the fiberglass.
Details

 05-21-2010
2.00
Tested avionics and trim.
Details

 05-14-2010
4.00
Finished right wing lighting, worked fiberglass.
Details
     

 05-13-2010
4.00
Worked fiberglass parts, finished FWF inventory.
Details
     

 05-12-2010
6.00
Worked fiberglass, started FWF inventory.
Details
       

 05-03-2010
3.00
Worked on the cowling fiberglass.
Details
       

 04-20-2010
5.00
Finished gas pipe, worked glass, started light kit
Details
       

 04-18-2010
5.00
Flaperon controls, gas tank, baggage area.
Details
     

 04-14-2010
2.50
Cleaned fiberglass, inventoried lighting kit.
Details
       

 04-11-2010
2.50
Installed wings, drilled flaperon torque tubes.
Details
       

 04-10-2010
2.00
Attached flaperons to wings
Details

 04-08-2010
2.00
Finished rear window and side skins.
Details
       

 04-06-2010
4.00
Reorganized for remaining pre-engine tasks.
Details
       

 04-03-2010
2.00
Primed & painted parts.
Details
     

 03-31-2010
1.50
Worked on tailcone & cowl hinges.
Details
       

 03-30-2010
5.50
Worked on cowl hinges and tail cone.
Details
     

 03-28-2010
2.50
Assembled oil door.
Details
       

 03-21-2010
6.00
Worked on hinges and pins, cowling parts.
Details
       

 03-20-2010
6.00
Finished prepping fiberglass pieces.
Details
       

 03-17-2010
3.50
Worked cowling halves toward scribe lines.
Details
       

 03-13-2010
2.00
Selected parts & cowling pieces, started prepping.
Details
       

 02-27-2010
4.00
Finished gear/brake install, worked on canopy.
Details
       

 02-24-2010
4.00
Avionics part II, brakes, canopy.
Details
       

 02-21-2010
7.00
Finished landing gear, worked on canopy.
Details
       

 02-20-2010
3.00
Removed canopy, installed compass sensor.
Details
       

 02-20-2010
4.00
Main landing gear install.
Details
       

 02-19-2010
3.00
Prepped nosegear and compass for tomorrow.
Details
       

 02-17-2010
5.50
More sanding & filling, parts prep.
Details
       

 02-16-2010
3.50
More filling, parts prep.
Details

 02-15-2010
6.00
Sanding and more sanding.
Details
       

 02-11-2010
6.00
Finished layup, assembled wheels.
Details
       

 02-10-2010
6.50
Completed side fiberglass layups.
Details
       

 02-08-2010
3.00
More sanding and patching.
Details
       

 02-07-2010
2.50
Sanded foam blocks and plexiglass.
Details
       

 02-05-2010
5.00
Cut out fiberglass, glued foam blocks.
Details
       

 02-04-2010
3.50
Reworked canopy skirts.
Details
       

 02-03-2010
3.50
Started on fiberglass fairing.
Details
     

 02-02-2010
0.00
Reworked guide blocks.
Details

 02-01-2010
5.00
Worked on canopy and latching mechanism.
Details
       

 01-31-2010
4.00
Screwed bubble to frame.
Details
     

 01-30-2010
5.00
Drilled side skirts, finished all canopy holes.
Details
       

 01-29-2010
6.50
Final (I hope) trimmed and finished the canopy.
Details

 01-28-2010
5.00
Canopy drilling - OMG!
Details
       

 01-23-2010
6.00
Started canopy fitting process.
Details
       

 01-09-2010
2.00
Corrected offset countersink, worked small parts.
Details
     

 01-07-2010
3.00
Marked bow, experimented with plexiglass.
Details
       

 01-06-2010
3.00
Started canopy fitting.
Details
     

 01-04-2010
3.00
Prepped and primed canopy frame.
Details
       

 01-01-2010
5.00
Worked on canopy frame.
Details
       

 12-31-2009
2.00
Started canopy work.
Details
       

 12-30-2009
3.00
Loose ends, airframe upright, started canopy.
Details
       

 12-29-2009
5.00
Finished roughing in control cables
Details
       

 12-28-2009
7.00
Completed wiring, started control cables.
Details
     

 12-20-2009
0.00
Planning
Details

 12-19-2009
4.00
Completed flap handle mechanism.
Details
     

 12-18-2009
7.00
Installed control linkages & AP servos.
Details
       

 12-16-2009
6.00
Worked on AP and flight controls.
Details
       

 12-15-2009
3.00
Received the autopilot kit and started install.
Details
       

 12-11-2009
3.00
Continued work on controls.
Details
       

 12-10-2009
4.00
Prepped parts, started flap controls.
Details
       

 12-08-2009
6.50
Installed sticks & pedals, finished most wiring.
Details
     

 12-07-2009
5.50
Tank test, wiring, control sticks.
Details
       

 12-01-2009
4.00
Finished tank - for now.
Details
       

 11-30-2009
2.00
Spar pins & reed switch wiring.
Details

 11-29-2009
3.00
Worked on fuel tank.
Details
       

 11-28-2009
7.00
Spar pins, reed switches, wiring, OAT probe.
Details
       

 11-27-2009
6.00
More work on tank, went back to wiring.
Details
       

 11-26-2009
3.00
Continued tank work.
Details
       

 11-25-2009
3.00
Assembled/sealed about half of the tank.
Details
       

 11-24-2009
3.00
Finished prepping for tank assembly.
Details
       

 11-23-2009
3.00
Prep work on tank parts.
Details
     

 11-19-2009
5.00
Started wiring section.
Details
       

 11-18-2009
5.00
Finished inventory, started tank.
Details
       

 11-16-2009
6.50
Inventoried small parts.
Details
     

 11-14-2009
3.00
Started finish kit inventory, honored Jack.
Details
       

 11-13-2009
1.00
Unloaded finish kit crate.
Details
       

 06-21-2009
4.00
Repaired mixer assembly, prepped parts.
Details
       