Work Logs Found: 535
Category Work Time: 1742 Hours
 Date
Hours
Work Log Summary

Details

 07-11-2018
0.00
Completed inspection, test flew.

 07-07-2018
0.00
Finished re-assembly.

 07-05-2018
0.00
Completed CI.

 07-04-2018
0.00
FWF CI completed, tightened sticks.
Details

 06-29-2018
0.00
Finished HS mods, reinstalled.
     

 06-28-2018
0.00
Accomplished HS bearing mod and finished HS improv
       

 06-27-2018
0.00
Continued HS upgrade.
       

 06-26-2018
0.00
Completed ADS-B install, began HS upgrade.
Details
       

 06-25-2018
0.00
Finished nose wheel mod, worked on ADS-B install.
Details
       

 06-23-2018
0.00
Completed AST mods, began nose wheel upgrade.
       

 06-21-2018
0.00
Began CI and mods
Details
       

 05-28-2018
0.00
Completed deburring and priming.
     

 05-22-2018
0.00
Inventoried upgrade parts and began deburring.

 07-01-2017
0.00
Condition Inspection 2017
Details
       

 05-26-2017
0.00
Corrected excess play in AST linkage.
Details
     

 01-06-2016
0.00
Test flew carbs.
Details

 12-28-2015
0.00
Re-installed carbs.
Details
     

 12-06-2015
0.00
Removed carbs, sent to Lockwood.
Details
       

 05-11-2015
0.00
Condition Inspection completed.
Details

 05-08-2015
0.00
Mods
Details
       

 04-15-2015
0.00
Continued mods and inspection.
Details

 04-14-2015
0.00
Started mods and inspections.
Details
       

 04-13-2015
0.00
Removed Jane's wings, set up hangar for dual work/
Details
     

 04-12-2015
0.00
Replaced tires and tubes.

 10-02-2014
0.00
Installed reg/rec in new location
Details
       

 09-29-2014
0.00
Ducati reulator/rectifier failure.
Details
       

 07-11-2014
0.00
Removed malfunctioning SL-40, sent to Garmin.
Details
     

 06-17-2014
0.00
Installed capacittor to dampen noise on fuel press
Details

 06-05-2014
0.00
Replace fuel pressure sensor.
Details
     

 05-30-2014
0.00
Noted low fuel pressure indications.
Details

 05-21-2014
0.00
Finished condition inspection.
Details

 05-15-2014
0.00
Continued with mods and inspection.
Details
     

 05-09-2014
0.00
Fuel tank mods and inspection.
Details
       

 05-07-2014
0.00
Continued with mods and maintenance.
Details
       

 05-03-2014
0.00
Tank and wheels.
Details
       

 04-30-2014
0.00
Removed sight glass, added holes, fitted doublers.
       

 04-29-2014
0.00
Opened tank, removed ProSeal.
       

 04-28-2014
0.00
Removed wings, jacked plane, removed wheels & gas
       

 04-24-2014
0.00
Did run-up tests.

 04-10-2014
0.00
Repaired and painted wheel pant damaged on ice.

 03-20-2014
0.00
Finalized Thermostasis installation.
Details
       

 02-21-2014
0.00
Installed Thermostasis oil thermostat.
Details
       

 02-14-2014
0.00
Installed canopy seal kit
Details
       

 06-24-2013
0.00
Completed SB, installed FW stiffener.
Details
       

 06-20-2013
0.00
Began SB for Cooler Mount Improvement
Details
       

 04-10-2013
3.00
Finished, test flew.
Details

 04-09-2013
1.00
Finished wing mods.
Details

 04-08-2013
2.00
Wired wings.
Details

 04-05-2013
7.00
Installed bushings and muffler springs.
Details
       

 04-04-2013
6.00
Worked on wing wiring mod.
Details
       

 04-02-2013
0.50
Odds and ends.
Details

 04-01-2013
2.00
New plugs and weatherstripping.
Details
       

 03-29-2013
2.00
Reassembled.
Details
     

 03-28-2013
6.00
Began re-assembly.
Details
     

 03-27-2013
3.00
Continued with inspection.
Details
     

 03-26-2013
4.00
Continued with inspection.
Details
       

 03-25-2013
5.00
FInished PTT's, started inspection.
Details
       

 03-21-2013
6.00
Wing connector, power plug, pump switch.
Details
       

 03-20-2013
2.00
Continued on lighting upgrade.
Details

 03-19-2013
0.00
Last day of winter - a foot of snow.

 03-18-2013
5.00
Worked on lighting upgrade kit.
Details
       

 03-15-2013
1.00
Sam serviced wheels and removed covers.
Details
       

 03-14-2013
6.00
Finished MLG mod except for reassembly steps.
Details
       

 03-13-2013
7.00
Installed doublers.
Details
       

 03-12-2013
6.00
Began SB
Details
       

 03-11-2013
1.00
Began condition inspection.
Details

 03-04-2013
1.00
Prepped and primed aluminum parts.
     

 03-02-2013
2.00
Deburred kit parts.
Details
       

 12-10-2012
2.00
Inventoried SB and wing wiring kits.
Details

 11-28-2012
0.00
Got transponder recertified at NA Aviation.

 10-09-2012
3.00
Finished SB.
Details
     

 10-08-2012
2.00
Removed U-1202 brackets
Details

 10-03-2012
2.00
Began SB 12-09-26.
Details
       

 09-27-2012
1.00
Changed oil and filter, took sample.
Details

 07-11-2012
4.00
Installed extra filter capacitor.
Details
       

 06-21-2012
1.00
More work on audio levels.
Details

 06-18-2012
8.00
Worked on alternator whine.
Details
       

 02-26-2012
0.00
Completed paperwork, fueled.
Details

 02-24-2012
0.00
Installed firewall shield, completed inspection.

 02-17-2012
0.00
Finished interior kit.
Details
       

 02-16-2012
0.00
Installed lower cowl, started interior kit.
Details
       

 02-15-2012
0.00
Continued reassembly.
Details
     

 02-14-2012
0.00
Worked on inspection.
Details
     

 02-13-2012
0.00
Finished mods, began inspection.
Details
     

 02-11-2012
0.00
Finished access panels, painted.

 02-10-2012
0.00
Made access panel mods.
Details
       

 02-09-2012
0.00
Finished tank mod, updated avionics.
Details

 02-08-2012
0.00
Worked on mods.
Details
       

 02-07-2012
0.00
More mods & upgrades.
Details
       

 02-06-2012
0.00
Began inspection & modifications.
Details
       

 12-09-2011
0.00
Installed replacement throttle springs.
Details
       

 09-18-2011
0.00
Best Homebuilt, Simsbury Fly-in!
Details
       

 09-14-2011
0.00
Finished cosmetics, waxed.
Details
       

 09-10-2011
2.00
Enlarged spar slots, painted plexiglass backside.
Details
       

 09-05-2011
8.00
Cosmetic touch-ups.
Details
       

 06-25-2011
0.00
Installed baggage area tie-down strap.
Details
       

 06-16-2011
1.00
Installed the new N numbers.
Details
       

 06-14-2011
0.50
Installed placards
Details
     

 06-06-2011
3.00
Installed sunshade.
Details
       

 06-04-2011
0.00
More tweaks, 25 hour inspection.
Details
     

 05-20-2011
0.50
Tested prop balance
Details

 05-18-2011
0.50
Installed cowl.
Details

 05-14-2011
0.50
Found/fixed "rattle."
Details

 05-12-2011
2.00
Reinstalled spinner, looked for rattle.
Details

 05-11-2011
2.00
Completed balancing of prop.
Details
       

 05-10-2011
4.00
Continued work on balancing.
Details

 05-09-2011
2.00
Worked with Ed on balancing.
Details

 05-08-2011
0.50
Set up sensor mounts.
Details
       

 05-07-2011
3.00
Tightened swivel, adjusted prop pitch.
Details
       

 05-03-2011
0.00
Worked on nosewheel swivelling, tested.
Details

 05-01-2011
0.00
Tested prop vibration, nose wheel tension.
Details

 04-28-2011
2.00
Trimmed, reinstalled nose pant.
Details

 04-27-2011
2.00
Tested wheel pants, adjusted.
Details
       

 04-26-2011
3.00
Installed all wheel pants.
Details
       

 04-25-2011
1.00
Picked up wheel pants, started install.
Details
       

 04-22-2011
5.00
Painted wheel pants.
Details
       

 04-10-2011
0.00
Flew, checked prop.
Details

 04-09-2011
0.00
Finished test hours, took CJ for a ride.
Details
     

 04-08-2011
0.00
Reassembled baggage floor and other misc.
Details
       

 04-06-2011
2.00
Reinstalled prop.
Details
       

 03-18-2011
0.00
Sent prop to Sensenich, inspected weldments.
Details
       

 03-17-2011
0.00
Got shipping info and a Safety Alert
Details

 03-16-2011
1.00
Found apparent bad prop hub.
Details

 03-15-2011
2.00
Flew test card 5, vibrations back.
Details

 03-11-2011
5.00
Re-synced carbs, adjusted latch, tuned autopilot.
Details

 03-10-2011
2.00
Recalibrated prop pitch using new appliance.
Details
       

 03-09-2011
3.00
Reworked wing contacts, built level bracket.
Details
       

 03-08-2011
2.00
Flew test card 4.
Details

 03-04-2011
5.00
Made adjustments, flew Card 2.
Details
       

 03-03-2011
2.00
Replaced the FT-60 sensor.
Details
       

 03-02-2011
0.00
Received replacement FT-60 sensor.
Details

 03-01-2011
0.00
Checked internal battery charge.
Details

 02-28-2011
1.00
Hooked up battery charger.
Details

 02-26-2011
1.00
Worked on avionics issues.
Details

 02-24-2011
3.00
Corrected yaw and roll trim, added weather strip.
Details
       

 02-23-2011
2.00
Second flight, Card 1.
Details
       

 02-22-2011
2.00
Air under the tires!
Details
       

 02-20-2011
2.00
Checklist, tunnel cover, wind......
Details

 02-18-2011
2.00
Checked wheel alignment, confirmed bad FT-60.
Details

 02-17-2011
1.00
Taxi tests.
Details
       

 01-27-2011
3.00
Carb sync, taxi tests.
Details

 01-26-2011
2.00
ELT fiasco.
Details

 01-25-2011
4.00
Corrected stick alignment and opening.
Details
       

 01-24-2011
2.50
Made cooling baffles.
Details
       

 01-21-2011
3.00
FAA inspection complete, A/W certificate issued!
Details
     

 01-20-2011
5.00
Added ground wire, prepped for inspection.
Details
       

 01-19-2011
6.00
Weighed airplane, worked on fuel calibration.
Details
       

 01-17-2011
2.00
Corrected EGT reversal.
Details
     

 01-15-2011
2.00
Audited checklists, organized remaining tasks list
Details

 01-14-2011
6.00
Drained fuel, installed cowling.
Details
       

 01-13-2011
3.00
Tried for carb sync run, too cold.
Details
     

 01-12-2011
3.00
Sanded wheel pants - again.
Details

 01-11-2011
4.00
Final wing install, first engine run.
Details
       

 01-08-2011
2.00
Filled pin holes - again.
Details
       

 01-07-2011
7.00
Worked on the wing installation, made tapered pin.
Details
       

 01-06-2011
3.00
Readied right wing for installation.
Details
     

 01-05-2011
2.00
Paperwork preview.
Details

 01-04-2011
0.00
Delivered Arrow to Graham in SC.
Details
       

 12-29-2010
2.00
Ramp iced, no engine run, other small tasks.
Details
       

 12-28-2010
6.00
Prepped for first engine runs.
Details
       

 12-27-2010
2.00
Final? canopy trim, stabilator tests.
Details
       

 12-23-2010
4.00
Finished tail fitting, other tasks.
Details
       

 12-22-2010
6.00
Worked problem areas, installed preheater.
Details
       

 12-21-2010
6.00
More final assembly work.
Details
       

 12-20-2010
6.00
Miscellaneous assembly tasks.
Details
       

 12-18-2010
0.00
Moved cowl to T hangar.
Details

 12-17-2010
0.00
Moved more parts to airport.
Details

 12-16-2010
5.00
Completed tail feather installation.
Details
       

 12-15-2010
6.00
Worked on tail feathers.
Details
       

 12-14-2010
3.00
Moved parts, prepped for stabilator install.
Details

 12-13-2010
3.00
Installed propeller and oil.
Details
     

 12-12-2010
6.50
Painting done except wheel pants.
Details
       

 12-11-2010
8.00
Painted.
Details
       

 12-10-2010
8.00
Installed access covers, primed parts.
Details
       

 12-09-2010
2.00
Completed fuel system checks.
Details
       

 12-08-2010
5.00
Completed retorquing engine capscrews.
Details
       

 12-07-2010
2.00
Worked on wheel pants.
Details

 12-07-2010
1.50
Applied FWF updates.
Details
       

 12-06-2010
3.00
Started work on engine related tasks.
Details
       

 12-04-2010
0.00
Moved parts and supplies to FBO hangar.
Details

 12-03-2010
3.00
Moved fuselage to NY0 FBO hangar.
       

 12-02-2010
3.00
Moved wings to T hangar at NY0.
       

 12-01-2010
4.00
Prepped wheel pants.
Details

 11-28-2010
9.00
Finished fuselage painting.
Details
       

 11-27-2010
7.00
Primed and painted white on fuselage.
Details
       

 11-26-2010
14.00
Primed and painted wings.
Details
       

 11-25-2010
6.00
Moved fuselage, began painting.
       

 11-24-2010
3.00
Sanded and epoxied all fairings.
Details
     

 11-24-2010
5.00
Moved parts, prepped paint shop.
Details
       

 11-23-2010
7.00
Continued on wheel pants.
Details
       

 11-22-2010
2.00
Recieved Spruce shipment, worked left pant.
Details
       

 11-21-2010
0.00
Moved wings to paint shop.
Details
       

 11-20-2010
4.00
Finished nose leg fairing.
Details
       

 11-19-2010
8.00
Worked on nose pant, fairing.
Details
       

 11-18-2010
9.00
Worked the nose pant.
Details
       

 11-17-2010
6.00
Continued work on wheel pants.
Details
       

 11-16-2010
7.00
Worked on main gear wheel pants.
Details
     

 11-15-2010
2.00
Inventoried wheel pants kit.
Details
     

 11-15-2010
4.00
Bled brakes again, worked on PAP tasks.
Details
       

 11-14-2010
0.00
Worked on trailer, built bleeder.
Details
     

 11-13-2010
0.00
Worked on trailer, visited paint shop.
Details

 11-12-2010
0.00
Picked up trailer, cleaned.
Details

 11-11-2010
5.00
Filled brake system. Observed air bubbles.
Details
       

 11-10-2010
5.00
Finished roughing fuselage, ran pitot/static tests
Details
       

 11-09-2010
4.00
Roughed the fuselage top and sides.
Details
       

 11-08-2010
4.00
Worked on right wing and ASTprep.
Details

 11-06-2010
4.00
Final primed fiberglass parts.
Details
       

 11-05-2010
3.00
Continued prep of left wing.
Details

 11-04-2010
6.00
Finished roughing right wing, started left.
Details
       

 11-02-2010
4.00
Trimmed, prepped right wing top surface.
Details
       

 11-01-2010
7.00
Worked on fiberglass and aluminum paint prep.
Details
       

 10-29-2010
5.00
Worked aluminum and fibergass.
Details

 10-28-2010
4.50
Sanded fiberglass primer.
Details
     

 10-27-2010
5.50
Primed fiberglass.
Details
       

 10-25-2010
2.00
Still working the fiberglass........
Details
       

 10-24-2010
2.00
Sanded fiberglass parts.
Details

 10-23-2010
4.00
Inspected and worked fiberglass.
Details
       

 10-22-2010
2.00
Installed placards.
Details
       

 10-21-2010
2.50
Finished data cable, installed tunnel cover.
Details
       

 10-20-2010
4.00
Installed seats, began work on data cable.
Details
       

 10-19-2010
5.00
Worked on miscellaneous finish items.
Details
       

 10-16-2010
5.00
Sanded final skim coat of epoxy.
Details
     

 10-15-2010
6.00
Coated fiberglass, installed pump noise filter.
Details
       

 10-14-2010
4.00
Hooked up tail control surfaces, then disassembled
Details
       

 10-02-2010
2.00
Drilled cone, checked clearances with trim.
Details

 10-01-2010
6.00
Finished tail cone fitting.
Details
       

 09-23-2010
6.00
Worked on fitting the tail cone.
Details
       

 09-22-2010
6.00
Finished the under-the-cowl work.
Details
       

 09-21-2010
3.00
Installed oil cooler and hoses.
Details
       

 09-20-2010
5.50
Hooked up engine controls, heat proofed cowl.
Details
       

 09-19-2010
5.00
Worked on engine controls, odds & ends.
Details
       

 09-18-2010
2.00
Installed soft start harness.
Details
       

 08-30-2010
2.00
Cleaned shop, replaced pitot tubing.
Details

 08-20-2010
7.00
Cowling essentially finished!
Details
       

 08-19-2010
3.00
Continued on the never-ending cowl work.
Details

 08-18-2010
6.50
Continued work on cooling duct & miscellaneous.
Details
       

 08-16-2010
4.00
Continued work on cooling duct.
Details
       

 08-15-2010
5.00
Worked on cooling duct.
Details
       

 07-30-2010
0.00
Oshkosh Experiences
Details

 07-14-2010
0.50
Update Dynon Software
Details

 07-07-2010
6.00
Catching up odds and ends.
Details

 07-04-2010
1.00
Cut pipe, played with muffler position.
Details
       

 07-03-2010
2.00
Mounted oil cooler, repositioned muffler.
Details
       

 07-02-2010
8.00
Worked on oil and cooling systems.
Details
       

 07-01-2010
7.00
Fabricated cooler box, mounted oil tank.
Details
       

 06-30-2010
8.00
Cowling, exhaust, cooling.
Details
       

 06-29-2010
8.00
Installed cowl hinges.
Details
     

 06-27-2010
2.00
Worked on cowl fit.
Details
       

 06-26-2010
2.00
Worked on lower cowl fit.
Details

 06-25-2010
2.00
Retorqued engine bolts, worked on cowling.
Details

 06-24-2010
6.00
Re-gapped coils, started cowl fitting.
Details
       

 06-21-2010
6.50
Finished the spinner.
Details
       

 06-20-2010
0.00
Andrew, Kate, & Erin learn about homebuilding.
Details
       

 06-19-2010
4.00
Mounted prop, worked fiberglass.
Details
     

 06-17-2010
7.00
Installed pitot tube and worked fiberglass.
Details
       

 06-16-2010
5.50
FWF plumbing and wiring.
Details
       

 05-31-2010
4.00
Hung the engine!
Details
       

 05-30-2010
3.00
Installed drip trays, prepared to hang engine.
Details
       

 05-29-2010
4.00
Installed shroud, assembled engine topside.
Details
       

 05-27-2010
3.50
Completed cooling shroud, installed mount.
Details
       

 05-26-2010
4.00
Epoxy coated fiberglass, began engine teardown.
Details
       

 05-23-2010
2.00
Met with Rob, worked the fiberglass.
Details

 05-21-2010
2.00
Tested avionics and trim.
Details

 05-20-2010
6.00
Installed electrical components.
Details
       

 05-19-2010
5.00
Finished cockpit light, checked battery fit.
Details
       

 05-18-2010
3.00
Worked on cockpit light.
Details
       

 05-15-2010
6.00
Finished left wingtip light.
Details
     

 05-14-2010
4.00
Finished right wing lighting, worked fiberglass.
Details
     

 05-13-2010
4.00
Worked fiberglass parts, finished FWF inventory.
Details
     

 05-12-2010
6.00
Worked fiberglass, started FWF inventory.
Details
       

 05-11-2010
2.00
Continued on light kit.
Details

 05-10-2010
4.50
Worked on wing extensions and strobe/nav lights.
Details
       

 05-09-2010
3.50
Worked on wingtip extensions.
Details
       

 05-08-2010
2.00
Reversed flaperon bolt & finished LL lens mount.
Details
       

 05-07-2010
5.00
Continued work on landing light.
Details

 05-05-2010
6.00
Discovered/recovered from big screw-up.
Details
       

 05-04-2010
5.00
Worked on right wing lights.
Details
       

 05-03-2010
3.00
Worked on the cowling fiberglass.
Details
       

 04-21-2010
3.00
Picked up FWF kit.
Details
       

 04-20-2010
5.00
Finished gas pipe, worked glass, started light kit
Details
       

 04-18-2010
5.00
Flaperon controls, gas tank, baggage area.
Details
     

 04-14-2010
2.50
Cleaned fiberglass, inventoried lighting kit.
Details
       

 04-11-2010
2.50
Installed wings, drilled flaperon torque tubes.
Details
       

 04-10-2010
2.00
Attached flaperons to wings
Details

 04-08-2010
2.00
Finished rear window and side skins.
Details
       

 04-06-2010
4.00
Reorganized for remaining pre-engine tasks.
Details
       

 04-03-2010
2.00
Primed & painted parts.
Details
     

 04-02-2010
5.00
Finished the tail cone.
Details
       

 03-31-2010
1.50
Worked on tailcone & cowl hinges.
Details
       

 03-30-2010
5.50
Worked on cowl hinges and tail cone.
Details
     

 03-28-2010
2.50
Assembled oil door.
Details
       

 03-21-2010
6.00
Worked on hinges and pins, cowling parts.
Details
       

 03-20-2010
6.00
Finished prepping fiberglass pieces.
Details
       

 03-17-2010
3.50
Worked cowling halves toward scribe lines.
Details
       

 03-13-2010
2.00
Selected parts & cowling pieces, started prepping.
Details
       

 03-13-2010
2.00
Finished avionics kit.
Details
     

 03-11-2010
9.00
Continued with avionics.
Details
       

 03-10-2010
2.50
Installed antennas.
Details
       

 03-09-2010
4.00
Avionics - EFIS, transponder, com radio.
Details
       

 03-08-2010
3.00
Worked on instrument panel.
Details
       

 03-06-2010
6.00
Began avionics kit.
Details
       

 02-27-2010
4.00
Finished gear/brake install, worked on canopy.
Details
       

 02-24-2010
4.00
Avionics part II, brakes, canopy.
Details
       

 02-21-2010
7.00
Finished landing gear, worked on canopy.
Details
       

 02-20-2010
3.00
Removed canopy, installed compass sensor.
Details
       

 02-20-2010
4.00
Main landing gear install.
Details
       

 02-19-2010
3.00
Prepped nosegear and compass for tomorrow.
Details
       

 02-18-2010
1.50
Sanding, filling, avionics inventory.
Details
       

 02-17-2010
5.50
More sanding & filling, parts prep.
Details
       

 02-16-2010
3.50
More filling, parts prep.
Details

 02-15-2010
6.00
Sanding and more sanding.
Details
       

 02-11-2010
6.00
Finished layup, assembled wheels.
Details
       

 02-10-2010
6.50
Completed side fiberglass layups.
Details
       

 02-08-2010
3.00
More sanding and patching.
Details
       

 02-07-2010
2.50
Sanded foam blocks and plexiglass.
Details
       

 02-05-2010
5.00
Cut out fiberglass, glued foam blocks.
Details
       

 02-04-2010
3.50
Reworked canopy skirts.
Details
       

 02-03-2010
3.50
Started on fiberglass fairing.
Details
     

 02-02-2010
0.00
Reworked guide blocks.
Details

 02-01-2010
5.00
Worked on canopy and latching mechanism.
Details
       

 01-31-2010
4.00
Screwed bubble to frame.
Details
     

 01-30-2010
5.00
Drilled side skirts, finished all canopy holes.
Details
       

 01-29-2010
6.50
Final (I hope) trimmed and finished the canopy.
Details

 01-28-2010
5.00
Canopy drilling - OMG!
Details
       

 01-23-2010
6.00
Started canopy fitting process.
Details
       

 01-09-2010
2.00
Corrected offset countersink, worked small parts.
Details
     

 01-08-2010
2.00
Drilled forward bow, fabbed the latch handles.
Details
       

 01-07-2010
3.00
Marked bow, experimented with plexiglass.
Details
       

 01-06-2010
3.00
Started canopy fitting.
Details
     

 01-05-2010
6.00
Temporarily installed aft window.
Details
       

 01-04-2010
3.00
Prepped and primed canopy frame.
Details
       

 01-01-2010
5.00
Worked on canopy frame.
Details
       

 12-31-2009
2.00
Started canopy work.
Details
       

 12-30-2009
3.00
Loose ends, airframe upright, started canopy.
Details
       

 12-29-2009
5.00
Finished roughing in control cables
Details
       

 12-28-2009
7.00
Completed wiring, started control cables.
Details
     

 12-22-2009
7.00
Riveted fuselage/empennage.
Details
     

 12-21-2009
4.00
Mated fuselage & empennage.
Details
       

 12-20-2009
0.00
Planning
Details

 12-19-2009
4.00
Completed flap handle mechanism.
Details
     

 12-18-2009
7.00
Installed control linkages & AP servos.
Details
       

 12-17-2009
2.00
Installed servo doubler.
Details
     

 12-16-2009
6.00
Worked on AP and flight controls.
Details
       

 12-15-2009
3.00
Received the autopilot kit and started install.
Details
       

 12-11-2009
3.00
Continued work on controls.
Details
       

 12-10-2009
4.00
Prepped parts, started flap controls.
Details
       

 12-09-2009
5.00
Finished wiring, started flight controls.
Details
       

 12-08-2009
6.50
Installed sticks & pedals, finished most wiring.
Details
     

 12-07-2009
5.50
Tank test, wiring, control sticks.
Details
       

 12-03-2009
3.00
More wiring.
Details
       

 12-01-2009
4.00
Finished tank - for now.
Details
       

 11-30-2009
2.00
Spar pins & reed switch wiring.
Details

 11-29-2009
3.00
Worked on fuel tank.
Details
       

 11-28-2009
7.00
Spar pins, reed switches, wiring, OAT probe.
Details
       

 11-27-2009
6.00
More work on tank, went back to wiring.
Details
       

 11-26-2009
3.00
Continued tank work.
Details
       

 11-25-2009
3.00
Assembled/sealed about half of the tank.
Details
       

 11-24-2009
3.00
Finished prepping for tank assembly.
Details
       

 11-23-2009
3.00
Prep work on tank parts.
Details
     

 11-19-2009
5.00
Started wiring section.
Details
       

 11-18-2009
5.00
Finished inventory, started tank.
Details
       

 11-16-2009
6.50
Inventoried small parts.
Details
     

 11-14-2009
3.00
Started finish kit inventory, honored Jack.
Details
       

 11-13-2009
1.00
Unloaded finish kit crate.
Details
       

 11-13-2009
2.00
Finished instrument panels.
Details
     

 11-10-2009
0.00
My buddy Jack slipped the surly bonds.....
Details
     

 11-09-2009
5.50
Worked on instrument panels and map box.
Details
     

 11-08-2009
3.00
Continued prepping panel and map box parts.
Details

 11-07-2009
3.00
Finished upper forward skin.
Details
       

 11-06-2009
5.00
Installed forward fuselage skin.
Details
       

 11-05-2009
4.50
Completed the panel base assembly.
Details
       

 11-04-2009
1.50
Corrected longeron misalignment problem.
Details
       

 11-03-2009
2.00
Discovered longeron misalignment problems.
Details
       

 11-02-2009
4.00
Worked on canopy ribs.
Details
       

 10-30-2009
5.00
Installed upper firewall.
Details
       

 10-29-2009
7.00
Built the upper firewall.
Details
       

 10-28-2009
7.50
Finished roll bar and aft bulkhead structure.
Details
       

 10-27-2009
4.00
Drilled and painted roll bar.
Details

 10-26-2009
6.00
Mounted side skins and roll bar.
Details
       

 10-25-2009
2.50
Finished side skin prepping and painting.
Details
     

 10-24-2009
4.00
Drilled longerons.
Details
       

 10-23-2009
6.00
Worked on frames and side skins.
Details
       

 10-22-2009
3.00
Painted interior.
Details
       

 10-20-2009
6.00
Trial fit rudder and masked interior.
Details
       

 10-17-2009
4.50
Completed rudder/brake pedal assembly.
Details
       

 10-16-2009
2.00
Began work on rudder/brake pedals.
Details
       

 10-15-2009
3.00
Finished roll bar.
Details

 10-14-2009
1.00
Primed roll bar parts.
Details

 10-13-2009
4.00
Assembled and drilled roll bar.
Details
       

 10-12-2009
6.00
Finished seat backs, started roll bar.
Details
       

 10-11-2009
4.00
Finished prepping seat back parts.
Details
     

 10-08-2009
4.00
Tested interior paint, began seat backs.
Details
       

 10-05-2009
2.00
Installed exhaust fan.
Details
       

 10-04-2009
1.00
Rudder pedal powder coat problems.
Details
       

 10-03-2009
5.00
Finished fuel system.
Details
       

 10-02-2009
7.00
Continued work on fuel system - some problems.
Details
       

 09-30-2009
3.00
Began work on the fuel system.
Details
       

 09-29-2009
3.00
Finished prepping all Section 23 parts and stored.
Details
     

 09-28-2009
6.50
Temporarily installed side skins to fit longerons.
Details
       

 09-27-2009
5.00
Dry fit fuselage members including longerons.
Details
       

 09-26-2009
3.00
Reorganized workbench.
Details
     

 09-25-2009
5.00
Fabricated longerons.
Details
       

 09-24-2009
2.00
Started longerons.
Details

 09-23-2009
0.00
Visit to the factory.
Details
       

 09-08-2009
2.00
Finished Section 22.- Forward Lower Fuselage.
Details
       

 09-06-2009
1.00
Mated two fuselage sections.
Details
       

 09-03-2009
3.00
Continued on Forward Lower Fuselage.
Details

 09-02-2009
3.00
Finished Page 22-02.
Details

 09-01-2009
0.00
P-51 Mustang
Details
     

 08-31-2009
0.50
EAA 602 Meeting
Details
       

 08-29-2009
1.00
Broke in two "Rosies", worked on Section 22.
Details
       

 08-24-2009
1.00
Installed cooler stiffener.
Details
       

 08-23-2009
6.00
Summer update & some progress!
Details
       

 07-24-2009
6.00
Completed Section 21, center fuselage.
Details
     

 07-23-2009
4.00
Installed bulkhead and steps.
Details
     

 07-12-2009
1.00
Finished riveting bottom skin.
Details

 07-07-2009
1.00
Riveting bottom skin.
Details

 07-06-2009
2.00
Clecoed bottom skin.
Details
       

 07-05-2009
3.00
Worked on bottom skin.
Details
       

 07-04-2009
1.00
Installed corner skins with Nick & Lauren.
Details
       

 07-03-2009
3.00
Installed fuselage corner skins.
Details
       

 07-02-2009
5.00
Continued with assembly, flipped over.
Details
       

 07-01-2009
4.00
Finished bulkhead, installed control column.
Details
       

 06-30-2009
3.50
Continued assembling bulkhead.
Details
       

 06-29-2009
1.00
Fabricated control column mounts.
     

 06-25-2009
1.00
Prepped bulkhead doublers.
Details

 06-24-2009
5.00
Prepped bulkhead and parts.
Details
     

 06-22-2009
5.00
Finished seat area and joined to center section.
Details
       

 06-21-2009
4.00
Repaired mixer assembly, prepped parts.
Details
       

 06-20-2009
7.00
Worked on seat frames.
Details
     

 06-18-2009
6.50
Finished baggage area, began seat area.
Details
       

 06-15-2009
4.00
Continued work on baggage floor assembly.
Details
     

 06-13-2009
2.00
Riveted baggage floor, installed nutplates.
Details

 06-09-2009
3.50
Squeezed rivets, began baggage floor assembly.
Details
     

 06-08-2009
6.00
Prepped parts.
Details
     

 06-07-2009
3.50
Completed Section 20 except for final riveting.
Details
     

 06-06-2009
4.00
Building up Center Section Assembly.
Details
       

 06-03-2009
2.00
Hung up on center assembly leaning.
Details
       

 05-27-2009
1.00
Continued prepping parts.
Details
     

 05-26-2009
4.50
Prepped parts for Section 20.
Details

 05-20-2009
2.00
Finished flaperons.
Details
       

 05-17-2009
1.50
Finished flaperons except for rivets.
Details
     

 05-15-2009
1.50
Fuselage kit inventory 100% comlete!
Details
     

 05-14-2009
8.00
Worked on fuselage kit inventory.
Details
       

 05-10-2009
3.50
Finished right skeleton, started skins.
Details
       

 05-09-2009
4.50
Worked on right flaperon.
Details

 05-08-2009
4.00
Almost finished left flaperon.
Details
     

 05-07-2009
8.00
Finished left flaperon skeleton.
Details
     

 05-06-2009
0.00
Picked up fuselage kit.
Details
       

 05-05-2009
7.00
Bungled through flaperon work.
Details
       

 05-04-2009
2.50
Fabricated flaperon brackets
Details
       

 05-03-2009
1.00
Began fabricating flaperon brackets.
Details

 05-02-2009
5.50
Finished and stored right wing.
Details
 

 05-01-2009
1.00
Continued assembling wingtip. Cleco/rivet pictures
Details
       

 04-30-2009
0.00
Update on No Progress.
Details

 04-23-2009
5.00
Pulled rivets and worked on wingtip.
Details
       

 04-21-2009
3.00
Continued working right wing skins.
Details
       

 04-20-2009
6.00
Continued on right wing skins.
Details
       

 04-17-2009
3.00
Finished bottom skins, flipped wing.
Details
     

 04-16-2009
1.50
More work on right wing skins.
Details

 04-15-2009
4.00
Continued work on right wing.
Details

 04-14-2009
2.00
Prepped and mounted first right wing skin.
Details
     

 04-13-2009
5.50
Assembled right wing skeleton.
Details
     

 04-11-2009
5.00
Finished and stowed left wing.
Details
       

 04-10-2009
7.00
Closed up left wingtip.
Details

 04-09-2009
1.00
Prepped left wingtip parts.
Details

 04-08-2009
6.00
Finished skins, started wingtip.
Details
       

 04-07-2009
3.00
Fitted and installed wing walk doubler.
Details
       

 04-06-2009
2.00
Tool trouble, worked on wing skins.
Details
       

 04-05-2009
2.00
Installed two top wing skins.
Details
     

 04-04-2009
7.00
Installed bottom skins on left wing.
Details
       

 04-03-2009
8.00
Finished skeleton, started skins.
Details
       

 04-02-2009
4.00
Had helpers, installed aft ribs and spar.
Details
       

 04-01-2009
6.00
Completed left wing rib preparation.
Details
       

 03-31-2009
1.00
Started final prep of ribs.
Details
       

 03-30-2009
6.00
Deburred rib holes, test assembled wing skeleton.
Details
       

 03-27-2009
2.00
Finished scalloped edge deburring, fluted.
Details
       

 03-26-2009
6.00
Worked on ribs.
Details
       

 03-25-2009
4.00
Finished rear spars, began working on ribs.
Details
       

 03-23-2009
9.00
Finished prepping Section 14 parts.
Details
     

 03-22-2009
2.00
Deburred parts.
Details

 03-21-2009
3.50
Prepped parts.
Details

 03-20-2009
2.00
Worked on spar assembly.
Details
       

 03-19-2009
2.00
Worked small spar parts.
Details
       

 03-19-2009
5.00
Inventoried and stored parts.
Details
       

 03-18-2009
2.00
Started unpacking & checking.
Details
       

 03-18-2009
4.00
Picked up wing kit.
Details
       

 03-12-2009
4.00
Prepared for wing construction.
Details

 03-11-2009
7.00
Built wing storage rack.
Details
       

 03-10-2009
3.00
Completed empennage!
Details

 03-09-2009
4.00
Worked the VS and rudder tip fairings.
Details
       

 03-07-2009
4.00
Cleaned garage storage spot.
Details

 03-06-2009
0.50
Re-organized and started fiberglass work.
Details

 03-03-2009
5.00
Finished & installed trim servo assembly.
Details
       

 03-02-2009
7.00
Mounted major tail surfaces, worked on trim parts
Details
       

 02-27-2009
2.50
Finished tailcone, mounted VS.
Details
     

 02-26-2009
6.00
Closed up tailcone.
Details
       

 02-25-2009
0.00
On vacation 2/9 - 2/24
Details

 02-07-2009
3.50
Installed upper skin, ready to rivet.
Details
       

 02-05-2009
3.00
One more skin.
Details

 02-04-2009
3.00
More skins, string, and wiring.
Details
     

 02-02-2009
2.50
Riveted bottom of fuselage.
Details
       

 02-01-2009
3.00
Started tailcone build up.
Details
     

 01-31-2009
3.00
Made AST repairs, worked on tailcone.
Details

 01-30-2009
5.00
Started tailcone skin preparation.
Details

 01-29-2009
3.00
Finished tailcone skeleton parts.
Details
     

 01-28-2009
7.00
Completed aft bulkhead assembly.
Details
       

 01-26-2009
5.00
Prepped ribs & small parts.
Details
     

 01-25-2009
2.00
Organized shop, started tailcone.
Details
       

 01-24-2009
2.00
Finished stabilator.
Details
       

 01-23-2009
4.50
Horizontal stabilator nearly complete.
Details
       

 01-22-2009
4.00
Continued Work on HS
Details
       

 01-21-2009
5.50
Continued Work on Stabilator
Details

 01-20-2009
2.50
Re-assembled HS Spar Assembly
Details
     

 01-19-2009
1.50
Disassembled HS Spar, Installed Brackets
Details
     

 01-17-2009
5.00
Continued on HS Spar Assembly
Details
       

 01-16-2009
7.50
Worked on Horizontal Stabilator Spar
Details

 01-14-2009
6.00
Repaired, finished AST's., worked on HS parts.
Details
       

 01-10-2009
4.00
Messed up control horns, began stabilator
Details
       

 01-09-2009
6.50
Completed vertical stabilizer, worked on AST
Details

 01-08-2009
5.00
Finished rudder, worked VS
Details
     

 01-07-2009
5.50
Worked on rudder and AST
Details
       

 01-06-2009
5.00
Worked on VS & Rudder
Details

 01-03-2009
3.00
Prepped VS skins
Details

 01-02-2009
3.00
Finished VS skeleton
Details
     

 01-01-2009
6.00
VS skeleton clecoed
Details
       

 12-31-2008
3.00
Reworked brackets, worked on VS spar
Details

 12-29-2008
3.50
Fabricated rudder hinge brackets
Details
       

 12-28-2008
3.00
Inventoried and stored sub-kits
Details
       

 12-26-2008
2.00
Organized small parts
Details
     

 12-26-2008
2.50
Inventoried and stored large parts
Details
     

 12-25-2008
2.50
Organized small parts
Details

 12-24-2008
4.00
Unpack/Inventory/Organize
Details
       

 12-23-2008
5.00
Picked up crate, read documentation
Details
       

 12-10-2008
20.00
Prepared shop, tools, benches.
Details
     